<< Back to case
Conditions or Reasons for Planning Application - CB/22/03985/DOC
Conditions or Reasons:
6) The development shall not commence above slab level until an updated Travel Plan has been submitted to and approved in writing by the Council, such a travel plan to include details of:

Joint working with other local employers and shared travel plan activities across the local industrial area
Predicted travel to and from the site and targets to reduce car use for both visitors and staff
Details of existing and proposed transport links, to include links to both pedestrian, cycle and public transport networks
Proposals and measures to minimise private car use and facilitate walking, cycling and use of public transport
Timetable for implementation of measures designed to promote travel choice
Plans for monitoring and review within 6 months of occupation and then annually for a period of 5 years at which time the obligation will be reviewed by the planning authority.
Details of provision of cycle parking in accordance with Central Bedfordshire Council guidelines.
Details of site-specific marketing and publicity information, to include:
Site specific travel and transport information,
Incentives for sustainable travel
Details of relevant pedestrian, cycle and public transport routes to, from and within the site.
Copies of relevant bus and rail timetables.
Details of the appointment of a travel plan co-ordinator.
An Action Plan listing the measures to be implemented and timescales for this
Details of the transfer of the Travel Plan obligation to the future occupier

No part of the development shall be occupied prior to implementation of those parts identified in the Travel Plan as capable of being implemented prior to occupation. Those parts of the approved Travel Plan that are identified as being capable of implementation after occupation shall be implemented in accordance with an agreed timetable and shall continue to be implemented as long as any part of the development is occupied.

Reason: To promote sustainable modes of travel and to reduce the potential traffic impact of the development on the local highway network
9) No above ground development shall take place until a final scheme of sound insulation works and acoustic construction details for the building hereby approved has been submitted to and approved in writing by the local planning authority. The scheme shall be based on the recommendations identified in the Adrian James Acoustics Acoustic Assessment Report (Ref:13084 Report 3) dated 26th January 2022. The building shall not be opened to the public until such a scheme has been fully implemented in accordance with the approved details, and shown to be effective, and it shall be retained in accordance with those details thereafter.

Reason: For the purposes of certainty in the acoustic design and construction of the building hereby consented.
11) No development shall take place until the required bat surveys outlined in the November 2021 Preliminary Ecological Appraisal Report have been undertaken by a suitably qualified ecologist. A report confirming the results and implications of the assessment, including any revised mitigation measures, shall be submitted to and approved by the Local Planning Authority before construction works commence on site. The mitigation measures shall be implemented in full accordance with the approved details.

Reason: To ensure the development causes no harm to protected species in accordance with policy EE3 of the Central Bedfordshire Local Plan.


Return to Search | Close WindowTop of Page