Conditions or Reasons for Planning Application - CB/22/04254/DOC
Conditions or Reasons:
7) The development hereby permitted shall not commence until an Electric Vehicle Charge Management Plan (EVCMP) has been submitted to and approved in writing by the Local Planning Authority. Such a management plan shall include details of:

a) The number of active charging points available to all users of the premises and to be no less than 10% of the spaces provided. Such details shall include the capacity of electricity supply to meet the demand from those charging points.

b) The provision of active charging to no less than 10 spaces for electric motorcycles and cycles. Such details shall include the capacity of electricity supply to meet the demand from those charging points and the secured housing for those vehicles.

The development shall not be occupied prior to implementation of the above details.

Reason: To promote sustainable and alternative modes of transport.
(Policy T5, CBLP July 2021, and Section 9, NPPF July 2021)
8) The development hereby approved shall not commence until a satisfactory landscaping scheme, in accordance with Drawing Nos. PL041 Rev P2 (Proposed Hard and Soft Landscape Plan) and 21-121-P-01 Rev D (Planting Plan) to include all proposed soft and hard landscaping within all areas of the site, a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme, and details of landscape management, have been submitted to and approved in writing by the Local Planning Authority. This shall include details of replacement planting as required, a schedule of works to be undertaken and management arrangements. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and / or first use of any part of the development (a full planting season means the period from October to March). The planting shall subsequently be maintained in accordance with the approved landscape maintenance scheme and management arrangements, and any which die or are destroyed during this period shall be replaced during the next planting season.
Reason: To ensure an acceptable standard of landscaping and to limit the visual impact of the development.
(Policies EE1 and EE4, CBLP July 2021, and Section 15, NPPF July 2021)
10) The development hereby permitted shall not commence until an Arboricultural Method Statement has been submitted to and approved in writing by the Local Planning Authority, to provide detailed mitigation measures, and detailed working methodology, to be undertaken around the designated Root Protection Areas of retained trees, which have been identified in the "Arboricultural Impact Assessment" as requiring the removal of existing hard surfacing. The approved Arboricultural Method Statement shall then be implemented in strict accordance with the specified sequence of operations outlined in this document.

Reason: To ensure that good Arboricultural working practices are adopted in respect of construction methods used within the designated Root Protection Areas of retained trees, so as to prevent damage to their respective rooting systems.
(Policy EE4, CBLP July 2021, and Section 15, NPPF July 2021)
16) The development hereby permitted shall not commence until a scheme for on-site surface water drainage works, including connection point and discharge rate, to ensure infrastructure improvements to an undersized sewer, has been submitted to and approved in writing by the Local Planning Authority. Development shall proceed in accordance with the approved scheme.

Reason: To prevent environmental and amenity problems arising from flooding.
(Policies CC3 and CC5, CBLP July 2021, and Section 14, NPPF July 2021 and its supporting technical guidance)


Return to Search | Close WindowTop of Page