| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building(s) hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the external appearance of the building/s in the interests of the amenities of the area. (Section 12, NPPF) |
3)
Notwithstanding the provisions of Part 1 Class E of Schedule 2 to the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area. (Section 12, NPPF) |
4)
No development shall take place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.
Reason: To ensure an acceptable standard of landscaping. (Sections 12 & 15, NPPF) |
5)
A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the building is occupied and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Section 12, NPPF) |
6)
Before development begins and notwithstanding the details submitted with the application, details of the materials to be used for the external windows, doors, walls, roof, rainwater goods and solar panel installations of the proposed building/s shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out only in accordance with the approved details. Reason: To ensure that the development is in keeping with the existing building. |
7)
No development shall take place until drawings of all new and proposed replacement windows and doors to a scale of 1:10 or 1:20, together with a specification of the materials and finishes has been submitted to and approved in writing by the Local Planning Authority. Details provided shall clearly show a section of the glazing bars, frame mouldings, door panels, the position of the door or window frame in relation to the face of the wall, the depth of the reveal and arch and sill details. The development shall be carried out only in accordance with the approved details. Reason: To ensure that the proposed development is carried out in a manner that safeguards the historic character of the building. |
8)
No development shall take place, until a schedule of works detailing all proposed repairs, re-instatement and making good to the fabric of the building has been submitted to and approved in writing by the Local Planning Authority. The development shall only be carried out only in accordance with the approved schedule of works. Details shall include a full and detailed specification of all materials to be used in the works. Reason: To ensure that the special historical and architectural interest and integrity of the building is conserved and maintained. |
9)
Before the development hereby permitted is commenced, a site investigation and asbestos survey shall be carried out to establish whether the site is contaminated, to assess the degree and nature of any contamination present, including asbestos within the existing buildings/structures on the site, and to determine its potential for the pollution of the water environment and risk to other receptors. The method and extent of the investigation shall be agreed with the Local Planning Authority in consultation with the Environment Agency prior to the commencement of work, but for the avoidance of doubt shall be carried out according to the requirements of the Local Planning Authority, including BS 10175:2011+A2:2017Investigation of potentially contaminated sites Code of practice and in compliance with and by a competent person who conforms to Land Contamination Risk Assessment (LRCM)guides. Reason: To ensure that any contamination which exists on the site is identified and properly dealt with in the interests of the residential amenity of the future occupiers of the site and of the surrounding area.(Section 15, NPPF) |
10)
A method statement setting out the proposed means of dealing with any contamination and asbestos present on the site, including measures to prevent pollution of groundwater and surface water, shall then be submitted in writing to the Local Planning Authority for approval in consultation with the Environment Agency before the development commences. There mediation strategy shall set out a timetable of works and the proposed means of dealing with any contamination and asbestos on site, including provisions for monitoring any specified actions and validating the outcomes. The development shall then proceed in strict accordance with the measures approved. If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until the developer has submitted a remediation strategy to the local planning authority detailing how this unsuspected contamination shall be dealt with and obtained written approval from the local planning authority. The remediation strategy shall be implemented as approved. All works must be carried out in compliance with and by a competent person who conforms to Land Contamination Risk Assessment (LRCM) guides. Reason: To ensure that any contamination which exists on the site is identified and properly dealt with in the interests of the residential amenity of the future occupiers of the site and of the surrounding area. (Section 15, NPPF) |
11)
Following completion of remediation works, the developer should submit a Verification Report to the Local Planning Authority for approval. The Verification Report should provide confirmation that all measures outlined in the approved Remediation Strategy have been completed including where appropriate validation testing. All works must be carried out incompliance with and by a competent person who conforms to Land Contamination Risk Assessment (LRCM) guides. Reason: To ensure that the site is suitable for its end use and to protect human health and the water environment. (Section 15, NPPF) |
12)
No external lighting shall be installed on the site/building unless details have first been submitted to the Local Planning Authority for its approval in writing. Any external lighting shall be installed in accordance with the approved details.
Reason: To provent light pollution, the residential amenity of neighbouring properties and/or highway safety. (Section 12, NPPF) |
13)
Prior to its installation, full details of any plant, machinery or equipment assocaited with the development hereby approved, shall be submitted to the Local Planning Authority for their approval. The external sound level (Rating Level) emitted from the plant, machinery or equipment thereby approved shall be not exceed the lowest existing Background Sound Level. The assessment shall be made in accordance with BS4142:2014 at the nearest and/or most affected noise sensitive premises, with all machinery operating together at maximum capacity. Reason: To protect the amenity of nearby residential occupiers. |
14)
All works shall be carried out in accordance with the details contained in the April 2022 'Protected Species Survey of Potters End Barns, Eversholt, Central Bedfordshire' as already submitted with the planning application and agreed in principle with the local planning authority prior to determination. Reason: To ensure existing or new habitats affected by development are managed effectively over an established period. (Section 15, NPPF) |
15)
No development shall take place until an Ecological Enhancement Strategy (EES) for the creation of new wildlife features such as hibernacula, the inclusion of integrated bird/bat and bee boxes in buildings/structures, hedgehog holes in fences and tree, hedgerow, shrub and wildflower planting/establishment has been submitted to and approved in writing by the local planning authority. The content shall include the: a) purpose and objectives for the proposed works; b) detailed design(s) and/or working method(s) necessary to achieve stated objectives(including, where relevant, type and source of materials to be used); c) extent and location of proposed works shown on appropriate scale maps and plans; d) timetable for implementation, demonstrating that works are aligned with the proposed phasing of construction; e) persons responsible for implementing the works; f) details of initial aftercare and long-term maintenance. The works shall be carried out strictly in accordance with the approved details and shall be retained in that manner thereafter Reason: To ensure development is ecologically sensitive and secures biodiversity enhancements in accordance with the National Planning Policy Framework. |
16)
Prior to development (including demolition), a Tree/Hedge Protection Plan and an Arboricultural Method Statement, prepared by a suitably qualified arboricultural consultant, shall be submitted to the Local Planning Authority for approval, based on the requirements stipulated in BS 5837 : 2012. The approved Tree/Hedge Protection Plan and Arboricultural Method Statement shall then be implemented in strict accordance with the required sequence of operations, with all tree/hedge protection barriers and/or ground protection, remaining securely in position throughout the entire course of demolition and construction works. REASON: To ensure that the roadside boundary hedge, and its associated trees, are not damaged in the course of demolition or construction operations, so as to maintain the rural character and visual amenity of the area, and help integrate the development into its surroundings |
17)
Prior to the construction of vehicular parking areas associated with the approved dwelling, a scheme for the charging of electric and ultra-low emission vehicles shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall accord with Policy T5 of the CBLP (and any future associated guidance that may be adopted by the Council) and shall include the following: Details of active charging posts or passive provision such as cabling and electricity supply for each dwelling Timescales / triggers for implementation of the scheme. The development shall be completed in accordance with these approved details including the agreed timescales / triggers. Reason: To assist with the transition to low-emission vehicles in line with Policy T5 of the CBLP and paragraph 110 of the National Planning Policy Framework |
18)
Prior to the occupation of the dwelling hereby approved, a scheme for the provision of fire hydrants at the development shall be submitted in writing to the Local Planning Authority for their approval. The fire hydrants serving the dwelling shall be installed as approved and thereafter retained in perpetuity. Reason: In the interests of fire safety and providing safe and accessible developments. |
19)
Prior to occupation of the dwelling hereby approved, a scheme for the secure and covered parking of cycles on the site (including the internal dimensions of the cycle parking area, stands/brackets to be used and access thereto), calculated at one cycle parking space per bedroom and 2 short stay spaces per unit, shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose. (See Informative 4)
Reason: To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport. |
20)
Details of a refuse collection point located at the site frontage and outside of the public highway and any visibility splays shall be submitted to and approved by the Local Planning Authority prior to the occupation of any dwelling. The scheme shall be fully implemented prior to occupation of any dwelling and shall be retained thereafter.
Reason: In the interest of amenity and in order to minimise danger, obstruction and inconvenience to users of the highway and the premises. |
21)
The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.
Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF) |
22)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plan numbers: A828_122_SITE_PLAN_PARKING_REV_02-15.02.2023, A828_121_SITE LOCATION PLAN_REV_03-15.02.2023, A828_116_EXISTING_AND_PROPOSED_SITE_PLAN_REV_05-15.02.2023, Existing Elevations - 12.12.2022, Proposed Elevations - 12.12.2022, Existing Floor Plan - 12.12.2022, A828201 Proposed Sections 04 16.11.2022, A828114 Roof Plan Rev 04 16.11.2022 and Proposed Floor Plan - 16.11.2022
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|