Conditions or Reasons for Planning Application - CB/22/04870/RM
Conditions or Reasons:
1) The development shall be constructed with external construction materials detailed on plan number RRTOD MCB ZZ ZZ DR A 0231 D5 - P10.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials to match the existing building in the interests of the visual amenities of the locality, in accordance with the NPPF.
2) Prior to occupation of the 55th dwelling, the road up the site boundary shall be completed such that a vehicular and pedestrian connection to the adjacent development site to the northwest is available for use.

Reason: To realise the benefit of the additional vehicular and pedestrian routes, in accordance with the outline planning permission (condition 18), Policy HQ1 of the adopted Local Plan and the NPPF.
3) If Plots 49-51 are occupied prior to the road connection being made to the adjacent development site to the northwest, a proposed visitor parking space to the front of Plot 52 shall serve as a refuse collection point for those three dwellings. Appropriate means shall be used to prevent the space being used for parking during this interim period. The space shall revert to a visitor space once the road connection is open.

Reason:
To provide interim refuse collection arrangements for Plots 49-51 that negate the need for long reverse manoeuvres by the refuse vehicle, in the interest of highway safety, in accordance with Policy HQ1 of the adopted Local Plan and the NPPF.
4) Within the site, visibility splays shall be provided at all road junctions. The minimum dimensions to provide the required junction visibility splay lines shall be 2.4m measured
along the centre line of the side road from its junction with the channel to the through road and 25m measured from the centre line of the side road along the channel of the through road. The vision splays required shall be provided and defined on the site by or on behalf of the developers and be entirely free of any obstruction. The Site Layout Plan includes minor widening of footways as necessary to facilitate these splays.

Reason:
To provide adequate visibility at road junctions in the interest of road safety, in accordance with Policy HQ1 of the adopted Local Plan and the NPPF.
5) Visibility splays shall be provided at the junctions of shared private accesses with the highway before the development is brought into use. The minimum dimensions to provide
the required splay lines shall be 2.4m measured along the centre line of the access from its junction with the channel of the public highway and 25m measured from the centre line of the access along the line of the channel of the public highway. The required vision splays shall, on land in the applicant's control, be kept free of any obstruction.

Reason:
To provide adequate visibility between the public highway and the shared private accesses,
and to make the accesses safe and convenient for the traffic which is likely to use them, in accordance with Policy HQ1 of the adopted Local Plan and the NPPF.
6) Before any access within the site (including individual plot driveways) is first brought into use, a triangular driver-pedestrian intervisibility splay shall be provided on each side of the new access drive and shall be 2.8m measured along the back edge of the highway from the centre line of the anticipated vehicle path to a point 2.0m measured from the back edge of the highway into the site along the centre line of the anticipated vehicle path. The vision splay so described and on land under the applicant's control shall be maintained free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level.

Reason:
To provide adequate visibility between the highway and the proposed accesses, and to make the accesses safe and convenient for the traffic which is likely to use them, in accordance with Policy HQ1 of the adopted Local Plan and the NPPF.
7) Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995 or any amendments thereto, the parking provision for the site as
detailed on the approved plans shall not be used for any purpose other than as parking provision unless permission has been granted by the Local Planning Authority on an application made for that purpose.

Reason:
To retain adequate parking provision for the development hereby permitted without adversely affecting the convenience of site and road users, in accordance with Policy HQ1 of the adopted Local Plan and the NPPF.
8) The maximum gradient of private accesses and driveways shall be 10% (1 in 10) for the first 6.0m measured into the site from the highway boundary.

Reason:
In the interests of the safety of persons using the access and users of the highway, in accordance with Policy HQ1 of the adopted Local Plan and the NPPF.
9) The driveway length in front of garages shall be at least 6.0m as measured from the garage doors to the highway boundary.

Reason:
To ensure that parked vehicles do not adversely affect the safety and convenience of road users by overhanging the adjoining public highway, in accordance with Policy HQ1 of the adopted Local Plan and the NPPF.
10) No dwelling shall be occupied until the carriageway(s) (including surface water drainage/disposal, vehicular turning head(s) and street lighting) providing access from the
nearest public highway to that dwelling has been completed to at least binder course level and the footway(s) to surface course level.

Reason:
To ensure a satisfactory means of access for occupants of the development, in accordance with Policy HQ1of the adopted Local Plan and the NPPF.
11) The development shall be carried out in accordance with the approved landscaping details. All soft landscaping shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March).

Reason: To ensure that the appearance of the site would be acceptable in accordance with Policy HQ1 of the adopted Local Plan and the NPPF.
12) Prior to the commencement of work above ground level, and notwithstanding the details submitted within the Ecological Enhancement Strategy, details of 16 artificial bat roosting cavity wall tubes provided within the development shall be submitted to the Local Planning Authority for approval in writing. The development shall be implemented prior to first occupation of the development and retained in accordance with the approved details.

Reason: To provide a net gain in terms of biodiversity, in accordance with the NPPF.
13) Notwithstanding the provisions of Part 1, Class A of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to Plots 28, 34 and 54 shall be carried out without the grant of further specific planning permission from the Local Planning Authority.

Reason: To maintain adequate amenity space, in accordance with Policy HQ1 of the adopted Local Plan, the adopted Design Guide and the NPPF.
14) The windows within the upper floor side elevations of the following dwelling plots shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be not be able to open beyond 100mm, unless the parts of the windows which can be opened are more than 1.7m above the floor of the room in which the window is installed. No further windows or other openings shall be formed in the side elevations of the dwellings.

15, 25, 29, 31, 32, 33, 42, 49, 50, 54 and 56

Reason:
To safeguard the privacy of occupiers of adjoining properties, in accordance with the NPPF and Policy HQ1 of the adopted Local Plan.
15) Prior to any development above ground level, an Energy Statement shall be submitted. This document shall include the following elements:

Each home must comply with Part L 2021. This will by default deliver a 31% saving in CO2 emissions over 2013 Part L, which is the baseline referenced in the condition. Note this point alone will ensure compliance with the condition.
The specification of heat pumps to every home will deliver a significant 50%+ saving in CO2 emissions over Part L 2021 or approximately a 66% saving over Part L 2013.
Each open market home will have a PV array sized to deliver an A rated EPC. The addition of PV will further reduce the site's emission rate

The development shall be completed in accordance with the approved details.

Reasons:
In the interests of sustainability, in accordance with adopted Local Plan policy HQ1 and the NPPF.
16) This consent relates only to the details shown on the submitted plans, numbers:

Layouts

RRTOD-MCB-ZZ-ZZ-DR-A-0230-D5-P11-Site Layout
RRTOD-MCB-ZZ-ZZ-DR-A-0231-D5-P10-External Materials and Boundary Treatment Plan
RRTOD-MCB-ZZ-ZZ-DR-A-0232-D5-P10-Surfacing Materials Plan
RRTOD-MCB-ZZ-ZZ-DR-A-0233-D5-P10-Affordable tenure plan
RRTOD-MCB-ZZ-ZZ-DR-A-0234-D5-P10-Refuse Strategy Plan
RRTOD-MCB-ZZ-ZZ-DR-A-0235-D5-P11-Parking Strategy Plan
RRTOD-MCB-ZZ-ZZ-DR-A-0236-D5-P9-Garden Area Plan

House Types

RRTOD-MCB-ZZ-ZZ-DR-A-0108-D5-P3-Fairford
RRTOD-MCB-ZZ-ZZ-DR-A-0109-D5-P3-Hawford
RRTOD-MCB-ZZ-ZZ-DR-A-0110-D5-P3-Claydon
RRTOD-MCB-ZZ-ZZ-DR-A-0111-D5-P3-Oakley
RRTOD-MCB-ZZ-ZZ-DR-A-0112-D5-P3-Kingston
RRTOD-MCB-ZZ-ZZ-DR-A-0113-D5-P4-Henley
RRTOD-MCB-ZZ-ZZ-DR-A-0114-D5-P3-Hallow Plans
RRTOD-MCB-ZZ-ZZ-DR-A-0115-D5-P3-Hallow Elevations
RRTOD-MCB-ZZ-ZZ-DR-A-0116-D5-P2-Hanwell Plans
RRTOD-MCB-ZZ-ZZ-DR-A-0117-D5-P2-Hanwell Elevations
RRTOD-MCB-ZZ-ZZ-DR-A-0118-D5-P3-Hanwell CT Plans
RRTOD-MCB-ZZ-ZZ-DR-A-0119-D5-P3-Hanwell CT Elevations
RRTOD-MCB-ZZ-ZZ-DR-A-0121-D5-P4-Campton Plans
RRTOD-MCB-ZZ-ZZ-DR-A-0122-D5-P5-Campton Elevations
RRTOD-MCB-ZZ-ZZ-DR-A-0123-D5-P1-Stanton
RRTOD-MCB-ZZ-ZZ-DR-A-0124-D5-P1-Dassett
RRTOD-MCB-ZZ-ZZ-DR-A-0130-D5-P3-A2
RRTOD-MCB-ZZ-ZZ-DR-A-0131-D5-P3-A3
RRTOD-MCB-ZZ-ZZ-DR-A-0132-D5-P3-A4
RRTOD-MCB-ZZ-ZZ-DR-A-0133-D5-P1-A2 MT
RRTOD-MCB-ZZ-ZZ-DR-A-0134-D5-P2-A3 Special
RRTOD-MCB-ZZ-ZZ-DR-A-0135-D5-P1-M43 ET
RRTOD-MCB-ZZ-ZZ-DR-A-0136-D5-P1-M43 MT
RRTOD-MCB-ZZ-ZZ-DR-A-0137-D5-P1-A1 CT
RRTOD-MCB-ZZ-ZZ-DR-A-0138-D5-P3-A3 V2

Garages

RRTOD-MCB-ZZ-ZZ-DR-A-0140-D5-P2-Single and Double Garages
RRTOD-MCB-ZZ-ZZ-DR-A-0141-D5-P2-Twin and Triple Garages
RRTOD-MCB-ZZ-ZZ-DR-A-0142-D5-P2-Car Barn

Landscape and Ecology

TOD-BWB-ZZ-XX-RP-LE-0001_BEMP-S2-P02
GL1867 01L Soft Landscape Proposals
GL1867 02L Soft Landscape Proposals

Technical

22090-BGC-PL - SPA01 K - Swept Path Analysis - Fire Tender
22090-BGC-PL - SPA02 J - Swept Path Analysis - Refuse Vehicle
22090-BGC-PL - SPA05 H - Swept Path Analysis - Service Van
22090-BGC-PL- 100 H - Drainage Strategy Layout Plan
22090-BGC-PL- 101 E - External Levels & Features Plan Sheet 1 of 2
22090-BGC-PL- 110 F - Access Road Layout Plan
.

Reason: To identify the approved plan/s and to avoid doubt.