Conditions or Reasons for Planning Application - CB/23/03306/DOC
Conditions or Reasons:
2) No above ground development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality and agree the details prior to construction.
(Policy HQ1 of the CBLP, and Section 12, NPPF)
3) The development hereby approved shall not be occupied until a hard landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall also be implemented prior to the occupation of any dwellinghouse.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
4) Prior to the commencement of the development hereby permitted, the applicant shall submit in writing for the approval of the local planning authority a scheme of noise attenuation measures which will ensure that internal noise levels from external rail and road traffic noise sources shall not exceed 35 dB LAeq, 07:00 - 23:00 in any habitable room or 30 dB LAeq 23:00 - 07:00 and 45 dB LAmax 23:00-07:00 inside any bedroom, and that external noise levels from external rail and road traffic noise sources shall not exceed 55 dB LAeq, (1hr) in outdoor amenity areas. Any works which form part of the scheme approved by the local authority shall be completed before any permitted dwelling is occupied.

Reason: To ensure the future residents of the site are appropriately protected from noise from the High Street.
(Policy HQ1 of the CBLP, and Section 12, NPPF)
5) No above ground level development shall take place until details demonstrating how the development will achieve the following have been submitted to an approved in writing by the Local Planning Authority:

1) 10% energy demand of the development to be delivered from renewable or low carbon sources or development's energy demand will be reduced by at least 10% through fabric measures;
2) Water efficiency to achieve water standard of 110 litres per person per day.

The development shall subsequently be implemented in accordance with the approved details.

Reason: To ensure that the development would be sustainable and would contribute towards the reduction of climate change.
(Policy CC1 of the CBLP, and Section 15, NPPF)
10) No above ground level development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.

Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas.
(Section 12, NPPF)
11) No development shall take place until details of the junction of the proposed vehicular access with the highway have been submitted to and approved in writing by the Local Planning Authority. No building shall be occupied until the junction has been constructed in accordance with the approved details.

Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises.
(Policy T2 of the CBLP, and Section 9, NPPF)