<< Back to case
Conditions or Reasons for Planning Application - CB/23/03323/DOC
Conditions or Reasons:
13) Prior to the occupation of a development, details of the proposed charging points and ducting shall be submitted to and approved in writing by the local planning authority. Details to be submitted should include:

Proposals to provide the minimum number of charging points as set out in the Council Electric Vehicle Charging SPD within the site for the charging of electric vehicles, together with associated signed / delineated car parking spaces, where required.
Details of the specification(s) of charge point(s) including power output, ducting / cable routes to all other car parking spaces within the site to enable charging points for the charging of electric vehicles to be provided for all other parking spaces in the site in the future.
Equipment design and colour.
A management and maintenance scheme (Charge Point Operation and Management Strategy) outlining how the charging points and associated car parking spaces will be managed and operated.
The process users can go through to activate passive charging points.

The approved development shall not be occupied until the scheme has been provided in accordance with the approved details, including the approved ducting / cable routes. The charging points and associated car parking spaces shall thereafter be retained, as approved, and shall remain available for use. The charging points and associated car parking spaces shall be managed and operated at all times in complete accordance with the approved Charge Point Operation and Management Strategy.

Reason: To ensure that adequate parking with facilities for the charging of electric vehicles are provided in accordance with Policy HQ1 High Quality Design, Policy T5 Ultra Low Emission Vehicles; Policy T3 Parking; Policy T2 Highways Safety and Design and Policy CC1 Climate Change and Sustainability and the National Planning Policy Framework.


Return to Search | Close WindowTop of Page