Conditions or Reasons for Planning Application - CB/23/03738/DOC
Conditions or Reasons:
4) No development shall take place above slab level until a landscaping scheme to include all hard and soft landscaping (including boundary planting and all hardsurfacing areas and internal roads) and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The hardsurfacing areas shall not be extended thereafter without the approval of the Local Planning Authority and the trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF and Policies EE4, EE5, H7 and HQ1 CBLP).
12) No development shall commence until a detailed surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100 year event (+40%CC), and a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The discharge rate from the development will be limited to el/s as agreed by the Bedford Group of Internal Drainage Boards. The final detailed design shall be based on DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 163 and 165 of the NPPF and its supporting technical guidance.(Policies CC3, CC5 and H7 CBLP).


Return to Search | Close WindowTop of Page