10) The community building hereby approved shall not be brought into use until an assessment to show that the rating level of any plant & equipment, installed as part of this development, will be equal to or below the background level, has been submitted to and been approved in writing by the Local Planning Authority.

The assessment must be carried out by a suitably qualified acoustic consultant/engineer and be in accordance with BS4142: 2014 Methods for rating and assessing industrial and commercial sound. The plant and equipment shall be installed and operated in accordance with the approved details.

Reason: In order to safeguard the amenities of adjoining residential occupiers. The details are needed prior to the start of work so that any mitigating measures can be incorporated into the build.
(Policy HQ1 of the CBLP)
11) No development relating to the construction of the community building shall take place until details of the sound reduction index performance of the construction materials of the main hall are submitted to the Local Planning Authority for written approval. (To include amongst other details, wall and roof structure, glazing, door sets and ventilation system.)

The scheme for the village hall shall achieve the standards stated in part i) and ii) below.
i) Between 07:00 to 23:00 hrs during the day noise from within the proposed development, including music and sounds of patrons shall cause no increase in the Laeq (5min) or more than a 2dBA increase in the Leq (5min) both in the 63Hz and 125Hz octave bands measured or predicted 1.0m from the nearest noise sensitive or residential facade or at 1.2m above any adjacent garden, terrace, balcony or patio. For all other octave bands there shall be no increase.
ii) Between 23:00 to 07:00 hrs, during the night, noise from within the proposed development, including music and sounds of patrons should cause no increase in the LAeq5min or Leq5min in all third octave frequency bands measured or predicted at 1.0m from the nearest noise sensitive or residential facade.

Reason: In order to safeguard the amenities of adjoining residential occupiers. The details are needed prior to the start of work so that any mitigating measures can be incorporated into the build.
(Policy HQ1 of the CBLP)