<< Back to case
Conditions or Reasons for Planning Application - CB/23/04084/DOC
Conditions or Reasons:
4) No development shall take place until a scheme for protecting the proposed dwelling from external noise sources has been submitted to and approved in writing by the local plannin gauthority. The scheme shall follow the recommendations identified in the Syntegra Noise Impact Assessment report (Ref: 21-7886) dated March 2021. The dwelling shall not be occupied until such a scheme has been implemented in accordance with the approved details, and it shall be retained in accordance with those details thereafter.

Reason: To protect the amenity of future occupiers of the dwelling hereby approved.
5) The development hereby permitted shall not begin until a scheme to deal with contamination of land/ground gas/controlled waters has been submitted to and approved in writing by the local planning authority. The scheme shall include all of the following measures, unless the local planning authority dispenses with any such requirement specifically in writing:

1. A Phase I site investigation report carried out by a competent person to include a desk study, site walkover, the production of a site conceptual model and a human health and environmental risk assessment, undertaken in accordance with BS 10175: 2011 Investigation of Potentially Contaminated Sites Code of Practice.
2. A Phase II intrusive investigation report detailing all investigative works and sampling on site, together with the results of the analysis, undertaken in accordance with BS 10175:2011 Investigation of Potentially Contaminated Sites Code of Practice. The report shall include a detailed quantitative human health and environmental risk assessment.
3. A remediation scheme detailing how the remediation will be undertaken, what methods will be used and what is to be achieved. A clear end point of the remediation shall be stated, and how this will be validated. Any ongoing monitoring shall also be determined.
4. If during the works contamination is encountered which has not previously been identified, then the additional contamination shall be fully assessed in an appropriate remediation scheme which shall be submitted to and approved in writing by the local planning authority.
5. A validation report detailing the proposed remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology shall be submitted prior to first occupation of the development. Details of any post-remedial sampling and analysis to demonstrate that the site has achieved the required clean-up criteria shall be included, together with the necessary documentation detailing what waste materials have been removed from the site.

Reason: To minimise and prevent pollution of the land and the water environment and in accordance with national planning policy guidance set out in section 11 of the National Planning Policy Framework, and in order to protect human health and the environment
6) No development shall take place until a scheme has been submitted to and approved in writing by the Local Planning Authority for the provision of fire hydrants at the development. Prior to the first occupation of the dwelling(s) the fire hydrant(s) serving that development shall be installed as approved. Thereafter the fire hydrant(s) shall be retained as approved in perpetuity.

Reason: In the interests of fire safety and providing safe and accessible developments.
(Section 7, NPPF)


Return to Search | Close WindowTop of Page