Conditions or Reasons for Planning Application - CB/24/00151/NMA
Conditions or Reasons:
31) Development in the Phase 3 area shown on drawing no. 7041-73 Rev A shall be carried out in accordance with the approved Remediation Strategy and Verification Plan for the development Hydrock, 22225-HYD-P3-XX-RP-GE-1005-S2-P04 dated July 2023). No building hereby permitted in the Phase 3 area shown on drawing no. 7041-73 Rev A, shall be first occupied or brought into use until:
A validation report detailing the proposed remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology shall be submitted prior to first occupation of the development. Details of any post-remedial sampling and analysis to demonstrate that the site has achieved the required clean-up criteria shall be included, together with the necessary documentation detailing what waste materials have been removed from the site; and
If during the works contamination is encountered which has not previously been identified, then the additional contamination shall be fully assessed in an appropriate remediation scheme which shall be submitted to and approved in writing by the local planning authority.

All works must be carried out in compliance with and by a competent person who conforms to Land Contamination Risk Management (LRCM) Guide (Environmental Agency 2020) or the current UK requirements for sampling and testing.

Reason: To minimise and prevent pollution of the land and the water environment and in order to protect human health and the environment, in accordance with Policy CC8 of the Central Bedfordshire Local Plan and the National Planning Policy Framework.