| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Prior to first occupation of the dwelling hereby approved, an Ecological Enhancement Strategy (EES) for the creation of new wildlife features such as bird/bat and bee boxes in buildings/structures and tree, hedgerow, shrub and wildflower planting/establishment shall be submitted to and approved in writing by the Local Planning Authority. Content shall include the:
a) detailed design of enhancements (including, where relevant, type and source of materials to be used); b) extent and location of proposed works shown on appropriate scale maps and plans; c) timetable for implementation, demonstrating that works are aligned with the proposed phasing of construction; d) persons responsible for implementing the works; e) details of initial aftercare and long-term maintenance.
Reason: To ensure development is ecologically sensitive and secures biodiversity enhancements. (Section 15, NPPF, Policy EE2, CBLP) |
3)
No development shall commence until a detailed surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100 year event (+40%CC+10%UC), via infiltration, and a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The final detailed design shall be based on the agreed Drainage Strategy (Ref:APEC, 24007-B4, 11/1/2024) and DEFRAs non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval. Details regarding points 1 to 10 within Informative Note 4 shall also be addressed.
Reason: To ensure that the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site. (Section 14, NPPF, Policy CC5, CBLP) |
4)
Prior to first occupation of the dwelling hereby approved, the developer shall formally submit in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and the approved surface water drainage scheme shall be correctly and fully installed as per the final approved details.
Reason: To ensure the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161, 18th December 2014. (Section 14, NPPF, Policy CC5, CBLP) |
5)
Prior to first occupation of the dwelling hereby approved, a scheme for the secure and covered parking of cycles on the site (including the internal dimensions of the cycle parking area, stands/brackets to be used and access thereto), calculated at one cycle parking space per bedroom and two short stay spaces per unit, shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be fully implemented before the dwelling is occupied and thereafter retained for that purpose.
Reason: To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport. (Section 9, NPPF, Policy T3, CBLP) |
6)
Prior to first occupation of the dwelling hereby approved, details of a refuse collection point located at the site frontage and outside of the public highway and any visibility splays shall be submitted to and approved by the Local Planning Authority. The scheme shall be fully implemented before the dwelling is occupied and shall be retained thereafter.
Reason: In the interest of amenity and in order to minimise danger, obstruction and inconvenience to users of the highway and the premises. (Section 9 and 12, NPPF, Policies HQ1 and T2, CBLP) |
7)
Prior to first occupation of the dwelling hereby approved, a scheme for the charging of electric and ultra-low emission vehicles for the dwelling shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include the following:
Details of active charging posts or passive provision such as cabling and electricity supply Timescales / triggers for implementation of the scheme.
The development shall be completed in accordance with these approved details including the agreed timescales / triggers.
Reason: To assist with the transition to low-emission vehicles. (Section 9, NPPF, Policy T5, CBLP) |
8)
Prior to first occupation of the dwelling hereby approved, a landscaping scheme to include all soft and hard landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.
Reason: To ensure an acceptable standard of landscaping. (Section 12 and 15, NPPF, Policies HQ1 and EE4, CBLP) |
9)
Prior to first occupation of the dwelling hereby approved, a scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the dwelling is occupied and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the area. (Section 12, NPPF, Policy HQ1, CBLP) |
10)
Notwithstanding the provisions of Schedule 2, Part 2, Class A of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no fences, gates, walls or other means of enclosure shall be erected within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area. (Section 12, NPPF, Policy HQ1, CBLP) |
11)
Notwithstanding the provisions of Schedule 2, Part 1, Class E of the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no buildings or other structures shall be erected or constructed within the curtilage of the property without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area. (Section 12, NPPF, Policy HQ1, CBLP) |
12)
Notwithstanding the provisions of Schedule 2, Part 1, Classes A and B of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions to the building hereby permitted shall be carried out without the grant of further specific planning permission from the Local Planning Authority.
Reason: To control the development in the interests of the visual amenity of the area. (Section 12, NPPF, Policy HQ1, CBLP) |
13)
No development above ground level shall take place, notwithstanding the details submitted within the application, until details of the materials to be used for the external walls, roofs and windows of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the development in the interests of the visual amenity of the area. (Section 12, NPPF, Policy HQ1, CBLP) |
14)
The development hereby permitted shall be undertaken in full accordance with the Council's adopted 'Environmental Code of Practice'
https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning/3
Reason: In order to minimise the impact of development on existing trees, landscape features and biodiversity. (Section 15, NPPF) |
15)
The development hereby permitted shall be undertaken in full accordance with the Council's adopted 'Construction Code of Practice for Developers and Contractors'
https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.
Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties. (Section 12, NPPF) |
16)
Prior to first occupation of the dwelling hereby approved, a scheme for the provision of waste receptacles for the dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided prior to occupation of the dwelling.
Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006). (Policy WSP5, Minerals and Waste Local Plan) |
17)
No development shall commence until a noise assessment has been submitted to the Local Planning Authority for approval of external noise levels incl. reflected and re-radiated noise and details of the sound insulation of the building envelope, orientation of habitable rooms away from major noise sources and of acoustically attenuated mechanical ventilation as necessary to achieve internal room and external amenity noise standards in accordance with the criteria of BS8233:2014. Approved details shall be implemented prior to occupation of the dwelling and thereafter be permanently retained.
Reason: To ensure satisfactory living conditions for future occupiers of the dwelling. (Section 12, NPPF, Policy HQ1 and CC8, CBLP) |
18)
No development shall commence until a scheme to deal with contamination of land/ground gas/controlled waters has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include all of the following measures, unless the Local Planning Authority dispenses with any such requirement specifically in writing:
1. A Phase I site investigation report carried out by a competent person to include a desk study, site walkover, the production of a site conceptual model and a human health and environmental risk assessment, undertaken in accordance with The Environment Agency Land Contamination Risk Management guidance (LCRM).
2. A Phase II intrusive investigation report detailing all investigative works and sampling on site, together with the results of the analysis, undertaken in accordance with LCRM. The report shall include a detailed quantitative human health and environmental risk assessment.
3. A remediation scheme detailing how the remediation will be undertaken, what methods will be used and what is to be achieved. A clear end point of the remediation shall be stated, and how this will be validated. Any ongoing monitoring shall also be determined.
4. If during the works contamination is encountered which has not previously been identified, then the additional contamination shall be fully assessed in an appropriate remediation scheme which shall be submitted to and approved in writing by the local planning authority.
5. A validation report detailing the proposed remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology shall be submitted prior to first occupation of the development. Details of any post-remedial sampling and analysis to demonstrate that the site has achieved the required clean-up criteria shall be included, together with the necessary documentation detailing what waste materials have been removed from the site.
Reason: To minimise and prevent pollution of the land and the water environment and in order to protect human health and the environment. (Sections 12 and 15, NPPF, Policies HQ1 and CC8, CBLP) |
19)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 23.205-P1 Rev 7 and 23.205-P2 Rev 3.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|