Conditions or Reasons for Planning Application - CB/24/00433/DOC
Conditions or Reasons:
13) Prior to the commencement of development of any phase as approved through the Phasing Plan under condition 2 of this planning permission, a detailed surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100 year event (+40%CC), and a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The discharge rate from the development will be limited to the equivalent 1 in 1 year rate, or an appropriate rate as agreed by the Bedford Group of Internal Drainage Boards or sewerage undertaker. The final detailed design shall be based on the agreed FRA and Drainage Strategy (Ref: AFP, RC173601, 7/11/17) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval.
The applicant should address the following points 1, 2, 3, 4, 5 and 9 when submitting details to discharge the condition:
Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with para 163 and 165 of the NPPF and its supporting technical guidance. To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161, 18th December 2014.


Return to Search | Close WindowTop of Page