| Conditions or Reasons for Planning Application - CB/24/00752/VOC |
| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of the principal planning permission, which is 4 July 2023.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
The development hereby approved shall be carried out in materials previously approved through CB/23/02596/DOC, dated 20 February 2024.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Section 12, NPPF) |
3)
The development shall not be occupied or brought into use until the parking scheme shown on Drawing No. SK63 Rev E has been completed. The scheme shall thereafter be retained for this purpose.
Reason: To ensure provision for car parking clear of the highway. (Policy T3 of the CBLP and Section 9, NPPF) |
4)
The development shall be carried out in relation to the provision of Electric Vehicle Charging (EVC) points, in exact accordance with the details previously approved through CB/23/02596/DOC, dated 20 February 2024. The EVC points shall be implemented in accordance with the approved details prior to the first use of the building, and retained as such thereby after.
Reason: To promote sustainable and alternative modes of transport. (Policy T5 of the Central Bedfordshire Local Plan and paragraph 111e of the NPPF) |
5)
The surface water drainage shall be constructed to manage surface water runoff from the development for up to and including 1 in 100 year event (+40%CC), via infiltration. The final detailed design shall be based on the agreed DS (Ref: Ardent, 171990-005, 8/3/2018) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval.
Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with CBC Local policy CC3 to CC5 and NPPF Paras 159 to 169 Inclusive of foot notes 54 to 56 and its supporting technical guidance. |
6)
The proposed drainage Maintenance and Management Plan for the surface water drainage system shall be carried out in exact accordance with the details previously approved through CB/23/02596/DOC, dated 20 February 2024.
Reason: To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161, 18th December 2014. |
7)
The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.
Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF) |
8)
The development hereby permitted shall be undertaken in full accordance with the Councils adopted Environmental Code of Practice https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning/3
Reason: In order to minimise the impact of development on existing trees, landscape features and biodiversity (Section 15, NPPF) |
9)
The village hall community building hereby approved shall not be used except between 0700 hours and 2300 hours on any day without the prior agreement in writing of the Local Planning Authority.
Reason: To protect the amenity of neighbouring residents. (Policy HQ1 of the CBLP) |
10)
The plant & equipment associated with the proposed development shall be installed, carried out and retained in accordance with the details previously approved through CB/23/03804/DOC dated 20 June 2024.
Reason: In order to safeguard the amenities of adjoining residential occupiers. The details are needed prior to the start of work so that any mitigating measures can be incorporated into the build. (Policy HQ1 of the CBLP) |
11)
The development hereby approved shall be carried out and retained in full accordance with the details previously approved through CB/23/03804/DOC dated 20 June 2024. These details relate to sound reduction and noise insulation.
Reason: In order to safeguard the amenities of adjoining residential occupiers. The details are needed prior to the start of work so that any mitigating measures can be incorporated into the build. (Policy HQ1 of the CBLP) |
12)
The proposed development shall be carried out in exact accordance with the lighting plan approved through CB/24/01512/DOC, dated 2 July 2024.
Reason: to protect the amenity of neighbouring residents from artificial light. (Policy HQ1 of the CBLP) |
13)
The development hereby approved shall be carried out in accordance with the details previously approved through CB/23/02596/DOC dated 20 February 2024, which relate to details of odour abatement.
Reason: In order to prevent the adverse impact of odours arising from cooking activities on the amenity of nearby residents. (Policy HQ1 of the CBLP) |
14)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:
SK63 Rev E BST100 SK60 Rev F
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|