Conditions or Reasons for Planning Application - CB/24/00879/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) All external works hereby permitted shall be carried out in the materials as described on drawing numbers; 3143-JBA-00-00-DR-A-1001 P03, 3143-JBA-01-00-DR-A-2101 T01, 3143-JBA-01-00-DR-A-2201 A01, 3143-JBA-01-01-DR-A-2102 T01, 3143-JBA-01-01-DR-A-2202 A01, 3143-JBA-01-00-DR-A-2105 T01, 3143-JBA-01-RF-DR-A-2205 A01, 3143-JBA-01-XX-DR-A-3101 A01, 3143-JBA-01-XX-DR-A-3102 A01, 3143-JBA-01-XX-DR-A-3103 A01, 3143-JBA-01-XX-DR-A-3201 A01, 3143-JBA-01-XX-DR-A-3202 A01, 3143-JBA-01-XX-DR-A-3203 A01, 3143-JBA-01-XX-DR-A-4200 A01.

Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with materials in the interests of the visual amenities of the locality.
(Section 12, NPPF)
3) Surface water control shall be provided via raised attenuation planters, and no development shall commence until a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The final detailed design shall be based on the agreed FRA & Drainage Strategy (Ref; Innervision, 232305, May 2023) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval. The discharge rate from the development will be limited to the equivalent 1 in 1 year rate, or an appropriate rate as agreed by the Bedford Group of Internal Drainage Boards.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with CBC Local Policy CC3 to CC5 and NPPF Paras 165 to 175 Inclusive of foot notes 59 and 60 and its supporting technical guidance.
4) The first floor window in the north-eastern elevation of the development hereby permitted shall be permanently fitted with obscured glass of a type to substantially restrict vision through it at all times and shall be non-opening, unless the parts of the window which can be opened are more than 1.7m above the floor of the room in which the window is installed. No other openings shall be formed in the north-eastern elevation.

Reason: To safeguard the privacy of occupiers of adjoining properties.
(Section 12, NPPF)
5) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers; 3143-JBA-00-00-DR-A-1001 P03, 3143-JBA-01-00-DR-A-2101 T01, 3143-JBA-01-00-DR-A-2201 A01, 3143-JBA-01-01-DR-A-2102 T01, 3143-JBA-01-01-DR-A-2202 A01, 3143-JBA-01-00-DR-A-2105 T01, 3143-JBA-01-RF-DR-A-2205 A01, 3143-JBA-01-XX-DR-A-3101 A01, 3143-JBA-01-XX-DR-A-3102 A01, 3143-JBA-01-XX-DR-A-3103 A01, 3143-JBA-01-XX-DR-A-3201 A01, 3143-JBA-01-XX-DR-A-3202 A01, 3143-JBA-01-XX-DR-A-3203 A01, 3143-JBA-01-XX-DR-A-4200 A01.

Reason: To identify the approved plan/s and to avoid doubt.