| Conditions or Reasons for Planning Application - CB/24/01926/FULL |
| Conditions or Reasons: | 1)
The development hereby permitted shall begin not later than three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
2)
Prior to first use of the development hereby approved, a 30 year (or as amended by sub-paragraph (4) of paragraph 9 of Schedule 7A of the Town and Country Planning Act 1990) Habitat Maintenance and Monitoring Plan (HMMP) shall be submitted to and approved in writing by the Local Planning Authority. The HMMP shall include:
how the habitat will be maintained who is responsible for creating or enhancing the habitats who is responsible for maintenance, management and monitoring
All maintenance and monitoring shall be carried out in accordance with the details provided.
Reason: To ensure the provision and maintenance of BNG in accordance with paragraph 9 of Schedule 7A of the Town and Country Planning Act 1990 and Policy EE2 of the Local Plan. |
3)
Notwithstanding the details shown, development shall not begin until details of the junction of the proposed vehicular access with the highway have been approved by the Local Planning Authority and no building shall be occupied until the junction, including dropped crossing points with tactile paving, has been constructed in accordance with the approved details.
Reason In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. |
4)
Visibility splays shall be provided at the junction of the access with the public highway before the development is brought into use. The minimum dimensions to provide the required splay lines shall be 2.4m measured along the centre line of the proposed access from its junction with the channel of the public highway and 43m measured from the centre line of the proposed access along the line of the channel of the public highway. The required vision splays shall for the perpetuity of the development remain free of any obstruction to visibility.
Reason To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it. |
5)
The proposed vehicular access shall be surfaced in bituminous or other similar durable material (not loose aggregate) as may be approved in writing by the Local Planning Authority for a distance of 5m into the site, measured from the highway boundary, before the development is brought into use. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway. Reason To avoid the carriage of mud or other extraneous material or surface water from the site into the highway so as to safeguard the interest of highway safety. |
6)
The maximum gradient of the vehicular access shall be 5% (1 in 20) for the first 6.0m measured into the site from the highway boundary and thereafter 1 in 10.
Reason In the interests of the safety of persons using the access and users of the highway. |
7)
The turning spaces and parking areas for vehicles illustrated on the approved Plan SK01 Rev A shall be constructed before the development is first brought into use.
Reason To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway. |
8)
All ecological measures and/or works shall be carried out in accordance with the details contained in the October 2024 EcIA report as already submitted with the planning application and agreed in principle with the local planning authority prior to determination.
Reason: To ensure that works are ecologically sensitive and do not result in adverse impacts to protected species. (Section 15 of the NPPF) |
9)
The premises shall only be open to customers between the hours of 6 am to 10 pm Mondays to Sundays.
Reason: To safeguard the residential amenity which the occupiers of neighbouring properties might reasonably expect to enjoy. (Section 12, NPPF) |
10)
The import of materials to the site for construction of the parking/turning area is to be matched level for level, volume for volume with materials removed from site. i.e. there is to be no increase of materials into the flood plain.
Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with CBC Local policy CC3 to CC5 and NPPF Paras 165 to 175 Inclusive of foot notes 59 and 60 and its supporting technical guidance |
11)
All external works hereby permitted shall be carried out in accordance with the approved plan 50P/Sk(A)24B.
Reason: To safeguard the appearance of the completed development by ensuring that the development hereby permitted is finished externally with appropriate materials in the interests of the visual amenities of the rural locality. (Section 12, NPPF) |
12)
The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers 2405-011.SK01(A), 2405-011.SK02(A), 40P/Sk(A)24D, 50P/Sk(A)24B.
Reason: To identify the approved plan/s and to avoid doubt. |
|
|---|