Conditions or Reasons for Planning Application - CB/24/03705/FULL
Conditions or Reasons:
1) The development hereby permitted shall begin not later than three years from the date of this permission.

Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:

23076-AKA-XX-00-DR-A-0001_P3;
23076-AKA-XX-00-DR-A-0002_P1;
23076-AKA-XX-00-DR-A-0201_P02;
23076-AKA-XX-00-DR-A-0501_P03;
23076-AKA-XX-00-DR-A-2101_P02;
23076-AKA-XX-00-DR-A-2102_P01;
23076-AKA-XX-00-DR-A-7001_P06;
23076-AKA-XX-00-DR-A-2101_P02;
23023C-CHD-XX-XX-DR-N-9002 S4;
CRU-DCE-03-XX-XX-SK-C-0004;
N1113 (03) 020 rev D;
N1113 (03) 021 rev E;
N1113 (03) 022.

Reason: To identify the approved plan/s and to avoid doubt.
3) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.

Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF)
4) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Environmental Code of Practice https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning/3

Reason: In order to minimise the impact of development on existing trees, landscape features and biodiversity (Section 15, NPPF)
5) No development shall take place, including any works of demolition, until a Construction Traffic Management Plan, associated with the development of the site and based broadly on the CTMP prepared by Local Transport Projects (October 2024), has been submitted and approved in writing by the Local Planning Authority which will include information on the following matters, as required: 

The parking of vehicles. 
Loading and unloading of plant and materials used in the development 
Storage of plant and materials used in the development. 
The erection and maintenance of security hoarding / scaffolding affecting the highway if required. 
Wheel washing facilities. 
Measures on site to control the deposition of dirt / mud on surrounding roads during the development. 
Footpath/footway/cycleway or road closures needed during the development period. 
Traffic management needed during the development period. 
Times, routes and means of access and egress for construction traffic and delivery vehicles (including the import of materials and the removal of waste from the site) during the development of the site. 
details of escorts for abnormal loads. 
temporary removal and replacement of highway infrastructure and street furniture. 
the reinstatement of any signs, verges or other items displaced by construction traffic. 
banksman and escort details. 
tracking diagrams. 
 
The approved Construction Management Plan associated with the development of the site shall be adhered to throughout the development process. 
 
Reason: Details are required pre-commencement to in the interests of highway and pedestrian safety and the free-flow of traffic.
6) Prior to first use of the development hereby permitted, the Applicant must submit a Public Rights of Way Schedule detailing the diversion of Cranfield Footpath No. 52 to the satisfaction of Central Bedfordshire Council. The Public Rights of Way Schedule shall include for the provision of suitable surfacing and widths (as detailed within the CBC Rights of Way Design Guide) and details for the making and confirmation of a Public Path Diversion Order. Within six months of the confirmation of any Diversion Order, the Applicant must carry out the footpath works for the footpath diversion to the satisfaction of the Council.

Reason: To remove the long-term obstruction of Footpath No. 52 and to provide a suitable route for the public to use to access the countryside and neighbouring villages in accordance with Policy EE12 of the Central Bedfordshire Local Plan (2021) and the objectives of the NPPF (2024).
7) No equipment, machinery or materials shall be brought on to the site for the purposes of development until an Arboricultural Method Statement and a Tree Protection Plan (in compliance with the details shown on Tree Retention and Removals Areas plan ref: N1113 (03)020 rev D) showing the details of substantial protective fencing for the protection of any retained trees and hedgerows, have been submitted to and approved in writing by the Local Planning Authority and the protective measures have been erected. The development shall be implemented in accordance with the approved Arboricultural Method Statement and Tree Protection Plan and the approved fencing shall be maintained until all equipment, machinery and surplus materials have been removed from the site.

Reason: The condition must be discharged prior to commencement to protect the trees and hedgerows to be retained in the interests of visual amenity, biodiversity and climate change mitigation. To accord with the objectives of Policies EE2, EE3, EE4 and EE9 of the Central Bedfordshire Local Plan (2021) and Sections 11 and 15 of the NPPF (2023).
8) Notwithstanding the submitted plans, the development hereby permitted shall not commence above slab-level until a landscaping scheme to include all hard and soft landscaping and any fencing details and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season. 
 
Reason: To ensure a satisfactory standard of development and in the interests of visual amenity. To accord with the objectives of Policies EE4 and HQ1 of the Central Bedfordshire Local Plan (2021).
9) No development shall take place until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority.  The CEMP shall set out measures during the construction phase to protect retained habitat features of importance and protected and priority fauna including bats, breeding birds, reptiles, common toad, harvest mouse and hedgehog, including through appropriate fencing and site best practice and the avoidance of pollution from run-off.  The approved CEMP shall be strictly adhered to throughout the construction process.  
 
Reason: The condition must be discharged prior to the commencement of development to ensure the protection of priority habitats and fauna throughout the construction period. To accord with the objectives of Policies EE1, EE2, EE3, EE4 and HQ1 of the Central Bedfordshire Local Plan (2021) and Section 15 of the NPPF (2023).
10) Prior to first use of the development hereby permitted, full details of a scheme for tree planting, to achieve a minimum canopy coverage of 30% of the application site area, and to include species type, location and quantity of planting and future management and maintenance scheme, shall be submitted to and approved in writing by the Local Planning Authority. The scheme thereby approved shall be implemented by the end of the full planting season immediately following the first use of the building hereby permitted (a full planting season means the period from October to March). The trees, shrubs and / or grass shall subsequently be maintained in accordance with a management and maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To accord with the objectives set out in Policy EE9 of the Central Bedfordshire Local Plan (2021) and the Forest of Marston Vale: Design Guidance Supplementary Planning Document (2022).
11) Prior to the commencement of the development, a detailed Ecological Enhancement Strategy shall be submitted to and approved by the local planning authority. The Ecological Enhancement Strategy shall include the following:

Purpose and conservation objectives for the proposed works.
review of site potential and constraints.
detailed design(s) and/or working method(s) to achieve stated objectives.
extent and location / area of proposed works on appropriate scale maps and plans (including elevation plans).
type and source of materials to be used where appropriate, e.g. native species of local provenance.
timetable for implementation demonstrating that works are aligned to the proposed phasing of development.
persons responsible for implementing works.
details of after-care and long-term maintenance and management of all soft landscaping and ecological enhancement measures.
details for monitoring and remedial measures.
details for disposal of any wastes arising from works.

The approved Ecological Enhancement Strategy shall be implemented in accordance with the approved details, and all features shall be retained in that manner thereafter.

Reason: To safeguard the character and appearance of the area including the intrinsic character and beauty of the Countryside, to ensure that the appearance of the development would be acceptable, as well as to ensure a net gain for biodiversity, in accordance with Policies EE1, EE2, EE4, EE5, EE13 and HQ1 of the Central Bedfordshire Local Plan (2021).
12) No development hereby permitted shall take place except in accordance with the terms and conditions of the Council's Organisational Licence (WML-OR152, or a 'Further Licence') and with the proposals detailed on plan 'Cranfield University Test Area (Project 3): Impact plan for great crested newt District Licensing (Version 1)', dated 4th June 2025.

Reason: In order to ensure that adverse impacts on great crested newts are adequately mitigated and to ensure that site works are delivered in full compliance with the Organisational Licence (WML-OR152, or a 'Further Licence'), section 15 of the National Planning Policy Framework, Circular 06/2005 and the Natural Environment and Rural Communities Act 2006.
13) No development hereby permitted shall take place except in accordance with Part 1 of the Great Crested Newt Mitigation Principles, as set out in the District Licence (WML-OR152, or a 'Further Licence') and in addition in compliance with the following:

Works to existing ponds onsite may only be undertaken during autumn / winter, unless otherwise in accordance with the Great Crested Newts Mitigation Principles
Works which will affect likely newt hibernacula may only be undertaken during the active period for amphibians.
Capture methods must be used at suitable habitat features prior to the commencement of the development (i.e., hand/destructive/night searches), which may include the use of temporary amphibian fencing, to prevent newts moving onto a development site from adjacent suitable habitat, installed for the period of the development (and removed upon completion of the development).
Amphibian fencing and pitfall trapping must be undertaken at suitable habitats and features, prior to commencement of the development.

Reason: In order to ensure that adverse impacts on great crested newts are adequately mitigated and to ensure that site works are delivered in full compliance with the Organisational Licence (WML-OR152, or a 'Further Licence'), section 15 of the National Planning Policy Framework, Circular 06/2005 and the Natural Environment and Rural Communities Act 2006.
14) No development shall be undertaken above slab level until full details of the colour and materials of all buildings and structures hereby approved, have been submitted to and approved in writing by the local planning authority. The development shall be installed in full accordance with the details thereby approved. 
 
Reason: To ensure a satisfactory standard of development and in the interests of visual amenity.
15) No development shall commence until a detailed surface water drainage scheme, to manage surface water runoff from the development for up to and including the 1 in 100-year event (+40%CC), via attenuated discharge to existing watercourse, and a maintenance and management plan for the scheme has been submitted to and approved in writing by the Local Planning Authority. The final detailed design shall be based on the agreed FRA & drainage Strategy (Ref; CRU-DCE-03-XX-RP-C-0002 rev P03) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval. The discharge rate from the development will be limited to the equivalent 1 in 1 year rate, or an appropriate rate as agreed by the Bedford Group of Internal Drainage Boards.

Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with Policies CC3, CC4 and CC5 of the Central Bedfordshire Local Plan (2021) and the NPPF (2024).
16) No development shall take place within 9 metres of the bank top of any Internal Drainage Board (IDB) watercourse adjoining the site boundaries, including any planting, fencing or other means of landscaping unless approved beforehand in writing by the Local Planning Authority in consultation with the Bedfordshire and River Ivel Internal Drainage Board. 
 
Reason: To ensure suitable access is retained for ongoing future maintenance of the watercourse.
17) No building hereby permitted shall be occupied until full details of the cycle stores have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in full accordance with the approved details.

Reason: To ensure a satisfactory standard of development and to comply with the objectives of Policy HQ1 of the Central Bedfordshire Local Plan (2021).
18) Prior to first use of the development hereby permitted, a scheme for the charging of electric and ultra-low emission vehicles shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall accord with Policy T5 of Central Bedfordshire Local Plan and the Electric Vehicle Charging: Guidance for New Developments SPD (2022) and shall include the following:

Details of active charging posts or passive provision such as cabling and electricity supply for each space provided.
Timescales / triggers for implementation of the scheme.

The development shall be completed in accordance with these approved details including the agreed timescales / triggers.

Reason: To assist with the transition to low-emission vehicles in line with Policy T5 of the Central Bedfordshire Local Plan (2021) and paragraph 114 of the National Planning Policy Framework (2023).