Conditions or Reasons for Planning Application - CB/25/00471/DOC
Conditions or Reasons:
5) The development hereby permitted shall not commence until the access junction visibility splays detailed on plan reference C2293-SK02B Visibility and 16.5m articulated early turn SPA (denoted by the blue lines) are provided, including any hedge clearance and hedge replanting required to secure the splays in question. The required vision splays shall be 2.4m measured along the centre line of the proposed access from its junction with the channel of the public highway and 160.0m measured from the centre line of the proposed access along the line of the channel of the public highway to the north and to the south. The required vision splays shall be kept clear of any obstruction throughout the lifetime of the development.

Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
(Policy T2, CBLP July 2021, and Section 9, NPPF July 2021)
6) The development hereby permitted shall not commence until the forward visibility splays detailed on plan reference C2293-SK02B Visibility and 16.5m articulated early turn SPA (denoted by the red lines) are provided, including any hedge clearance and hedge replanting required to secure the splays in question. The required vision splays shall be kept clear of any obstruction throughout the construction works.
Reason: To provide adequate visibility between the existing highway and the proposed access, and to make the access safe and convenient for the traffic which is likely to use it.
(Policy T2, CBLP July 2021, and Section 9, NPPF July 2021)