Conditions or Reasons for Planning Application - CB/25/00893/DOC
Conditions or Reasons:
3) No development shall take place, including any works of demolition, until a Construction Traffic Management Plan, associated with the development of the site, has been submitted and approved in writing by the Local Planning Authority which will include information on:
(A) The parking of vehicles
(B) Loading and unloading of plant and materials used in the development
(C) Storage of plant and materials used in the development
(D) The erection and maintenance of security hoarding / scaffolding affecting the highway if required.
(E) Wheel washing facilities
(F) Measures on site to control the deposition of dirt / mud on surrounding roads during the development.
(G) Footpath/footway/cycleway or road closures needed during the development period
(H) Traffic management needed during the development period.
(I) Times, routes and means of access and egress for construction traffic and delivery vehicles (including the import of materials and the removal of waste from the site) during the development of the site.

The approved Construction Management Plan associated with the development of the site shall be adhered to throughout the development process.

Reason: These matters are required prior to the commencement of any development in the interests of safety, protecting the amenity of local land uses, neighbouring residents and highway safety.
4) No development approved by this permission shall take place until a Phase 2 site investigation has been undertaken and a detailed report of the findings has been submitted to and approved in writing by the Local Planning Authority, in accordance with the recommendations of the Soiltechnics Phase I Desk Study Report dated July 2021 (Ref: STT5392) . Where found to be necessary by the phase 2 report a remediation strategy to deal with the risks associated with contamination of the site shall also be submitted to and approved in writing by the Local Planning Authority. The remediation strategy shall include an options appraisal giving full details of the remediation measures required and how they are to be undertaken. The strategy shall include a plan providing details of how the remediation works shall be judged to be complete and arrangements for contingency action.

Reason: These matters are required prior to the commencement of any development in order to protect human health and the environment, in accordance with Policy CC8 of the Central Bedfordshire Local Plan.