Conditions or Reasons for Planning Application - CB/25/01125/DOC
Conditions or Reasons:
3) A scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the building is occupied and be thereafter retained.

Reason: To safeguard the appearance of the completed development and the visual amenities of the locality.
(Section 12, NPPF)
4) No above ground work shall take place until a landscaping scheme to include all hard and soft landscaping and a scheme for landscape maintenance for a period of five years following the implementation of the landscaping scheme have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
5) Prior to commencement of above ground works, notwithstanding the details submitted with the application, details of the materials to be used for the external walls and roofs of the development hereby approved shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality.
(Section 12, NPPF)
21) No works above slab level shall take place until full details shall be submitted in writing to the Local Planning Authority for their approval to demonstrate that the proposed access and turning provision to the dwelling hereby approved are compliant with Section A of the Building Regulations Approved Document B (Fire Safety) Volume 1 - Dwellinghouses-B5 Access and Facilities for the Fire Service.
Reason: In the interests of fire safety and providing safe and accessible developments.
(Section 7, NPPF)
24) Prior to the occupation of any dwelling on the site, a scheme for the provision of waste receptacles for each dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before occupation takes place.

Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006).