| Conditions or Reasons: | 5)
Notwithstanding the details shown, development shall not begin until details of the improvements to the junction of the vehicular access with the highway have been submitted to and approved by the Local Planning Authority and no building shall be occupied until the junction has been constructed in accordance with the approved details. Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. (Policies T2 & T3 of CBLP, Section 9 of NPPF) |
10)
Prior to occupation, a scheme for the secure and covered parking of cycles on the site, calculated at one cycle parking space per bedroom, shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose. Reason: To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport (Section 9, NPPF) |
12)
Details of a refuse collection point located at the site frontage, not within the public highway or any visibility splays, shall be submitted to and approved by the Local Planning Authority prior to the occupation of any dwelling. The scheme shall be fully implemented prior to occupation of any dwelling and shall be retained thereafter. Reason: In the interest of amenity and in order to minimise danger, obstruction and inconvenience to users of the highway and the premises.(Policies T2 & T3 of CBLP, Section 9 of NPPF) |
15)
Notwithstanding the details submitted with the application, a full selection of external material samples, including proposed replacement or supplementary timber cladding, face brick, rainwater goods, roof coverings including ridge elements, proposed to be used in respect of the development hereby approved shall be provided for consideration by, and the written approval of, the Local Planning Authority prior to the commencement of any work of construction onsite either by way of :-i) a full samples assemblage made available on site for Local Planning Authority inspection, with product types, including bricks, identified by product name and manufacturer) a full photographic materials schedule submission, with product types, including bricks, identified by product name and manufacturer, and proposed timber cladding shown in profile. The approved development shall be undertaken thereafter strictly in accordance with the approved details. Reason: To ensure that the approved development is carried out in a manner that safeguards the historic fabric and traditional character of the historic, and listed, buildings to be retained in the approved development (Section 16, NPPF). This is pre-commencement to ensure that appropriate materials are used to safeguard the historic fabric and traditional character of the buildings. |
16)
Notwithstanding the details submitted with the application, all boundary fencing and associated gates to be installed as part of the development hereby approved shall be strictly appropriate to the historic character of the site, full details of which, including intended finishes, shall be submitted to and approved in writing by the Local Planning Authority prior to any installation onsite, and the approved development shall be undertaken thereafter strictly in accordance with the approved details Reason: To ensure that the approved development is carried out in a manner that safeguards the historic character of the site and the character of the listed buildings which the site contains (Section 16, NPPF) |
17)
No development approved by this permission shall take place until the following has been submitted to and approved in writing by the Local Planning Authority:·A Phase 1 Desk Study report documenting the ground conditions of the site with regard to potential contamination;·A Phase 2 Site Investigation (where shown as necessary the Phase 1 Desk Study);·A Phase 3 Remediation Scheme (where shown as necessary by the Phase 2 Site Investigation) All such work shall be undertaken in accordance with BS:10175:2011 or other appropriate guidance issued by the regulatory authorities. The work shall be sufficient to ensure that measures will be taken to mitigate any risks to human health and the wider environment.
Reason: To protect human health and to ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990. This is a pre-commencement condition in order to protect human health prior to development and ensure any potential contamination is dealt with appropriately. |
19)
Prior to the occupation of any dwelling on the site, a scheme for the provision of waste receptacles for each dwelling shall be submitted to and agreed in writing by the Local Planning Authority. The receptacles shall be provided before occupation takes place.
Reason: In the interest of residential amenity and to reduce waste generation in accordance with the Councils's Minerals and Waste Local Plan 2014, Policy WSP5 and the adopted SPD "Managing Waste in New Developments" (2006). |
20)
Prior to the occupation of the dwelling hereby approved, details of an electric charging point within the site shall be submitted to and approved in writing by the local planning authority. The approved details shall be implemented, with the charging point available for use prior to occupation.
Reason: To ensure that adequate parking with facilities for the charging of electric vehicles are provided in accordance with Policy T5 Ultra Low Emission Vehicles; Policy T3 Parking; Policy T2 Highways Safety and Design and Policy CC1 Climate Change and Sustainability Paragraphs 110, of the National Planning Policy Framework. |
|
|---|