Conditions or Reasons for Planning Application - CB/25/03311/RM
Conditions or Reasons:
1) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:
6949-SSA_XX-XX-DR-A-001 Rev. P2 (Site Location Plan)
6949-SSA-XX-XX-DR-A-002 Rev. P7 Proposed Site Plan
6949-SSA-01-00-DR-A-100 Rev. P6 (Proposed Care Home Ground Floor Plan)
6949-SSA-01-01-DR-A-101 Rev. P6 (Proposed Care Home First Floor Plan)
6949-SSA-01-02-DR-A-102 Rev. P6 (Proposed Care Home Second Floor)
6949-SSA-01-RF-DR-A-103 Rev. P2 (Proposed Care Home Roof Plan)
6949-SSA-01-XX-DR-A-300 Rev. P3 (Proposed Care Home Section AA and BB)
6949-SSA-01-XX-DR-A-200 Rev. P4 (Proposed Care Home Elevation - Kingsland Walk)
6949-SSA-01-XX-DR-A-201 Rev. P4 (Proposed Care Home Elevation - Front Courtyard)
6949-SSA-01-XX-DR-A-202 Rev. P4 (Proposed Care Home Elevation- South from Residential)
6949-SSA-01-XX-DR-A-203 Rev. P4 (Proposed Care Home Elevation - Woodside Link)
6949-SSA-01-XX-DR-A-204 Rev. P4 (Proposed Care Home Elevation - Courtyard Looking North)
6949-SSA-01-XX-DR-A-205 Rev. P4 (Proposed Care Home Elevation - Courtyard Looking South)
6949-SSA-XX-XX-DR-A-206 Rev. P3 (Proposed Contextual Elevation)
6949-SSA-02-00-DR-A-150 Rev. P05 (Proposed Ground Floor Plan)
6949-SSA-02-01-DR-A-151 Rev. P05 (Proposed First Floor Plan)
6949-SSa-02-02-DR-A-152 Rev. P05 (Proposed 2nd Floor Plan)
6949-SSa-02-RF-DR-A-153 Rev. P05 (Proposed Roof Plan)
6949-SSA-02-DR-A-0005 Rev. P03 (3D Views)
6949-SSA-02-XX-DR-A-250 Rev. P06 (North Elevation)
6949-SSA-02-XX-DR-A-251 Rev. P6 (East Elevation)
6949-SSA-02-XX-DR-A-252 Rev. P05 (South Elevation)
6949-SSA-02-XX-DR-A-253 Rev. P05 (West Elevation)
6949-SSA-02-DR-A-350 Rev. P04 (Section A-A and B-B)
4175/2 Rev. A Boundary Treatment Plan
4175/1 Rev. F Landscape Masterplan

Reason: To identify the approved plan/s and to avoid doubt.
2) No building shall be occupied until the junction between the proposed access road and the wider development's advanced infrastructure road, as shown indicatively on plan ref. 6949-SSA-XX-XX-DR-A-002 Revision P7, has been constructed in accordance with the approved details, amended as necessary by the technical and safety audit process, and opened to traffic.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and of the proposed development.(Section 9, NPPF)
3) Before the premises are occupied all on site vehicular areas shall be surfaced in a stable and durable materials (not loose aggregate). Arrangements shall be made for surface water drainage from the site to soak away within the site so that it does not discharge into the highway or into the main drainage system.
Reason: To avoid the carriage of mud or other extraneous material or surface water from the site so as to safeguard the interest of highway safety and reduce the risk of flooding and to minimise inconvenience to users of the premises and ensure satisfactory parking of vehicles outside highway limits.(Section 9, NPPF)
4) The parking provision for the site as detailed on the approved plans shall not be used for any purpose other than as parking provision unless permission has been granted by the Local Planning Authority on an application made for that purpose.
Reason: To retain adequate parking provision for the development hereby permitted without adversely affecting the convenience of site and road users. (Section 9, NPPF)
5) Prior to occupation, a scheme for the parking of cycles (short- and long-stay) on the site (including the internal dimensions of the cycle parking area, stands/brackets to be used and access thereto) shall be submitted to and approved in writing by the Local Planning Authority.
The scheme submitted for approval shall accord with the Council's Parking Standards for New Development SPD (August 2023) or subsequent replacement. The scheme shall be fully implemented before the development is first occupied or brought into use and thereafter retained for this purpose.
Reason: To ensure the provision of adequate cycle parking to meet the needs of occupiers of the proposed development in the interests of encouraging the use of sustainable modes of transport. (Section 9, NPPF)
6) Prior to above ground construction, details of a scheme for electric vehicle charging provision, commensurate with the Council's Electric Vehicle Charging SPD (December 2022) or any subsequent revision, shall be submitted to, and approved in writing by, the local planning authority. The approved scheme shall be implemented prior to first occupation of the respective part of the development and thereafter retained in a serviceable condition for perpetuity of the development.

Reason: In the interest of encouraging and facilitating more sustainable forms of motorised transport
7) The development shall be implemented in accordance with the Energy and Sustainability Statement dated 3rd October 2025 by The PES. The development thereafter shall be carried out in accordance with the Energy and Sustainability Statement.
Prior to occupation of the development hereby permitted, a Verification Survey shall be submitted to and approved in writing by the Local Planning Authority, which confirms that measures to address climate change and sustainability have been implemented in full.
Reason: In the interest of sustainability and to minimise the impact of the development on climate change, in accordance with Policy CC1 of the Central Bedfordshire Local Plan.
8) Prior to commencement of above ground works an Ecological Enhancement Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall confirm feature types and totals, correct indicative orientations for bird and bat boxes in line with current good practice, any integrated measures, and an implementation programme to ensure installation during the appropriate construction stage. The development shall be carried out in accordance with the approved Plan and thereafter retained.
Reason: To secure biodiversity enhancements consistent with Development Plan policy and the approved Design Code.
9) Notwithstanding the submitted drawings, prior to commencement of above ground works a detailed landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include:
- all soft landscaping details, including planting schedules, species, densities and sizes;
- hard landscaping details and materials;
- details of landscape maintenance for a period of five years following completion;
- confirmation of green roof specifications for bin stores.
The approved landscaping scheme shall be implemented in the first planting season following first occupation of the development. Any trees, shrubs or plants which die, are removed or become seriously damaged or diseased within five years of planting shall be replaced in the next planting season with others of similar size and species unless otherwise agreed in writing by the Local Planning Authority.
Reason: To ensure a high quality landscape setting that accords with the approved Design Code and safeguards visual amenity.
10) Prior to commencement of above ground works, full elevations and material details for all bin stores shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be implemented and available for use prior to occupation of the development and retained thereafter.
Reason: In the interest of visual amenity and to ensure a high standard of amenity for future occupiers.
11) Prior to commencement of above ground works, a scheme for (non highways) external lighting shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall:
identify luminaire locations/specifications, illuminance and light-spill controls;
avoid illumination of habitats/green corridors and ecological features, using
warm-white light (=3000K) and full cut-off/shielding where required;
demonstrate compatibility with designing-out-crime principles for paths, communal
entrances and parking; and
include management/maintenance arrangements.
The approved scheme shall be installed prior to first occupation of the development and retained thereafter unless otherwise agreed in writing.
Reason: To provide safe and inclusive access, reduce crime/fear of crime and ensure no adverse impact on neighbouring amenity (CBLP HQ1; NPPF Ch. 12) and to protect biodiversity (NPPF Ch. 15).
12) Prior to commencement of above ground works No development above ground level shall commence until a detailed schedule of external materials for all buildings has been submitted to and approved in writing by the Local Planning Authority. The schedule shall include:
full brick specifications;
full cladding specifications;
roof tiles (type, profile and colour);
mortar colour and joint profile;
window and door materials and finishes;
feature brickwork or detailing (e.g., soldier courses, string courses, contrasting panels);
rainwater goods (material and colour);
The development shall thereafter be carried out in accordance with the approved details and retained as such.
Reason: To ensure a high-quality appearance consistent with the Area 3 Design Code and to safeguard the character of the development.
13) Noise resulting from the use of any plant, machinery or equipment on the site shall not exceed the existing background level when measured or calculated according to BS4142:2014.

Reason: In the interest of neighbouring residential amenity (Section 12, NPPF)
14) Prior to the commencement of above ground works, a scheme shall be submitted to and approved in writing by the Local Planning Authority setting out how the affordable housing requirement arising from the assisted living units hereby approved shall be secured and delivered within the wider Houghton Regis North Site 1 development pursuant to Outline Planning Permission CB/12/03613/OUT.

The scheme shall include:

a) the location of the three affordable housing units to be provided;

b) the proposed tenure of those units;

c) the mechanism by which the units will be secured and delivered; and

d) the anticipated delivery timetable.

The approved scheme shall thereafter be implemented in accordance with the approved details unless otherwise agreed in writing by the Local Planning Authority.

Reason: To ensure that the affordable housing requirement associated with the development is appropriately secured and delivered in accordance with Policy H4 of the Central Bedfordshire Local Plan and the wider affordable housing requirements of Outline Planning Permission CB/12/03613/OUT.