Conditions or Reasons for Planning Application - CB/25/03402/VOC
Conditions or Reasons:
1) Before the development is brought into use the parking layout indicted on the approved plan no. PL04 rev C shall be implemented and thereafter retained as parking provision unless otherwise agreed in writing by the local planning authority

Reason: For the avoidance of doubt and to provide adequate less abled parking spaces
2) The surface water drainage shall be constructed to manage surface water runoff from the development for up to and including 1 in 100 year event (+40%CC), via discharge to an existing watercourse. The final detailed design shall be based on the agreed FRA and DS (Ref: Hardy-Tunstall, 224046, Rev P1, 9/9/2024) and DEFRAs Non-statutory technical standards for sustainable drainage systems (March 2018) and shall be implemented and maintained as approved. Maintenance will ensure the system functions as designed for the lifetime of the development. Any variation to the connections and controls indicated on the approved drawing which may be necessary at the time of construction would require the resubmission of those details to the Local Planning Authority for approval. The discharge rate from the development will be limited to the equivalent 1 in 1 year rate, or an appropriate rate as agreed by the Bedford Group of Internal Drainage Boards.

The applicant should address the following points 1 to 4 when submitting details to discharge the condition:
Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance.
The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components).
The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753).
Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.


Reason: To ensure the approved system will function to a satisfactory minimum standard of operation and maintenance and prevent the increased risk of flooding both on and off site, in accordance with CBC Local policy CC3 to CC5 and NPPF Paras 165 to 175 Inclusive of foot notes 59 and 60 and its supporting technical guidance.
3) No building shall be brought into use until the developer has formally submitted in writing to the Local Planning Authority a finalised 'Maintenance and Management Plan' for the entire surface water drainage system, inclusive of any adoption arrangements and/or private ownership or responsibilities, and that the approved surface water drainage scheme has been correctly and fully installed as per the final approved details.

Reason: To ensure that the implementation and long term operation of a sustainable drainage system (SuDS) is in line with what has been approved, in accordance with Written Statement HCWS161, 18th December 2014.
4) The landscaping scheme and management plan hereby approved shall be implemented by the end of the full planting season immediately following the completion and/or first use of any separate part of the development (a full planting season means the period from October to March). The trees, shrubs and grass shall subsequently be maintained in accordance with the approved landscape maintenance scheme and any which die or are destroyed during this period shall be replaced during the next planting season.

Reason: To ensure an acceptable standard of landscaping.
(Sections 12 & 15, NPPF)
5) The development hereby permitted shall be undertaken in full accordance with the Councils adopted Construction Code of Practice for Developers and Contractors https://www.centralbedfordshire.gov.uk/info/44/planning/674/codes_of_practice_for_planning.

Reason: In order to minimise the impact of construction work on the amenities of nearby residential properties (Section 12, NPPF)
6) The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers Location Plan, MCA324/01 Rev C, PL09, PL06 Rev D, PL05 Rev D, PL04 Rev C, PL03 Rev C and PL02 Rev A

Reason: To identify the approved plan/s and to avoid doubt.
7) Prior to first use of the SEN building hereby approved, notice in writing shall be given to the Local Planning Authority when the habitat creation and/or enhancement works as set out in the HMMP have been completed. The habitat specified in the approved HMMP shall then be managed and maintained in accordance with the approved details.

Reason: To ensure that BNG is provided on site (Policy EE2 of the CBC Local Plan)
8) The development shall be carried out in accordance with the material details as approved under reference CB/25/02552/DOC dated 1 September 2025.

Reason: To control the appearance of the building in the interests of the visual amenities of the locality and the heritage designations.
(Section 12 and 16, NPPF)