Conditions or Reasons for Planning Application - CB/25/03917/DOC
Conditions or Reasons:
24) No development shall take place within each development area (apart from the approved Advance Infrastructure Works (Condition 9 above)) until a scheme that includes the following components to deal with the risks associated with contamination within that development area or sub area of has been submitted to, and approved in writing by, the Local Planning Authority:1. A site investigation scheme for each development area of development, based on the Preliminary Risk Assessment to provide information for a detailed assessment of the risk to all receptors that may be affected.

2. The results of the development area site investigation and detailed risk assessment referred to in (1) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.

3. A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (3) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action.Any revisions to these components which may from time to time be prepared shall also be submitted for approval by the Local Planning Authority.

Reason: To protect and prevent the pollution of controlled waters and in accordance with Policies 43, 44, 48 & 49 of the emerging Development Strategy Central Bedfordshire for Pre-Submission. and Paragraphs 109, 120 & 121 of the National Planning Policy Framework (2012).


Return to Search | Close WindowTop of Page