| Conditions or Reasons: | 2)
No development shall take place, notwithstanding the details submitted with the application, until details of the materials to be used for the external walls and roofs of the development hereby approved have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.
Reason: To control the appearance of the building in the interests of the visual amenities of the locality. (Policy HQ1, CBLP and Section 12, NPPF) |
4)
Prior to the development being brought into use, a scheme shall be submitted for approval in writing by the Local Planning Authority indicating the positions, design, materials and type of boundary treatment to be erected. The boundary treatment shall be completed in accordance with the approved scheme before the buildings are occupied and be thereafter retained.
Reason: To safeguard the appearance of the completed development and the visual amenities of the locality. (Policy HQ1, CBLP and Section 12, NPPF) |
5)
No development shall take place until details of the existing and final ground and slab levels of the buildings hereby approved have been submitted to and approved in writing by the Local Planning Authority. Such details shall include sections through both the site and the adjoining properties, the location of which shall first be agreed in writing with the Local Planning Authority. Thereafter the site shall be developed in full accordance with the approved details.
Reason: To ensure that an acceptable relationship results between the new development and adjacent buildings and public areas. (Policy HQ1, CBLP and Section 12, NPPF) |
6)
Development shall not begin until details of the junctions between the proposed development and the highway have been submitted to, and approved in writing by, the Local Planning Authority.
Reason: In order to minimise danger, obstruction and inconvenience to users of the highway and the premises. (Policy T2, CBLP) |
12)
Before the premises are occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway.
Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises. (Policy T2, CBLP) |
13)
Development shall not begin until details of refuse storage area and collection point have been approved by the Local Planning Authority and no building shall be occupied until the said storage and collection points have been constructed in accordance with the approved details.
Reason: To ensure the refuse collection bins do not cause a hazard or obstruction to the highway or parking area. (Policy T2, CBLP) |
14)
Development shall not begin until details of secure cycle storage for residents and cycle parking for visitors have been approved by the Local Planning Authority and no building shall be occupied until the said storage and parking have been constructed in accordance with the approved details.
Reason: In order to promote sustainable modes of transport. (Policy T3, CBLP) |
15)
Development shall not begin until details of a turning area suitable for a light goods vehicle within the confines of the site for the replacement dwelling has been approved by the Local Planning Authority and that building shall be occupied until that turning area has been constructed in accordance with the approved details.
Reason: To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles on to the highway. (Policy T2, CBLP) |
16)
No works are in any circumstances to commence unless the local planning authority has been provided with either: a) a licence issued by Natural England authorizing the specified activity/development to go ahead; or b) a statement in writing from the relevant licensing body to the effect that it does not consider that the specified activity/development will require a licence.
Reason: To ensure that works do not result in adverse impacts to protected species. (Section 15 of the NPPF) |
17)
No development shall take place (including any, ground works, site clearance) until an ecological Precautionary Method of Working (PMW) has been submitted to and approved in writing by the local planning authority. The PMW shall be informed by the Samsara Ecology May 2023 Preliminary Ecological Appraisal and Samsara Ecology August 2023 Bat Surveys and include the:
a) Risk assessment of potentially damaging construction activities. b) Identification of "biodiversity protection zones". c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements). d) The location and timing of sensitive works to avoid harm to biodiversity features. e) The times during construction when specialist ecologists need to be present on site to oversee works. f) Responsible persons and lines of communication. g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person. h) Use of protective fences, exclusion barriers and warning signs.
The approved PMW shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the local planning authority.
Reason: To ensure that works do not result in adverse impacts to protected species. (Section 15 of the NPPF) |
18)
No development shall take place until an Ecological Enhancement Strategy (EES) for the creation of new wildlife features such as hibernacula, the inclusion of integrated bird/bat and bee boxes in buildings/structures, hedgehog holes in fences and tree, hedgerow, shrub and wildflower planting/establishment has been submitted to and approved in writing by the local planning authority. The content shall be informed by the Samsara Ecology May 2023 Preliminary Ecological Appraisal and Samsara Ecology August 2023 Bat Surveys and include the:
a) purpose and objectives for the proposed works; b) detailed design(s) and/or working method(s) necessary to achieve stated objectives (including, where relevant, type and source of materials to be used); c) extent and location of proposed works shown on appropriate scale maps and plans; d) timetable for implementation, demonstrating that works are aligned with the proposed phasing of construction; e) persons responsible for implementing the works; f) details of initial aftercare and long-term maintenance.
The works shall be carried out strictly in accordance with the approved details and shall be retained in that manner thereafter
Reason: To ensure development is ecologically sensitive and secures biodiversity enhancements in accordance with the National Planning Policy Framework. |
19)
No development shall commence or any construction machinery be brought onto the site until a Tree Protection Plan which identifies all trees on site to be retained and how they will be protected throughout the lifetime of the construction period shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in full accordance thereby after until the development is completed.
Reason: To ensure the trees identified as being retained are protected throughout the construction period. (Policy EE4, CBLP) |
|
|---|