<< Back to case
Conditions or Reasons for Planning Application - CB/26/01931/DOC
Conditions or Reasons:
22) No development shall commence until a Soil Management Pan has been submitted to and approved in writing by the Local Planning Authority. The Soil Management Plan shall include:
· Maps showing topsoil and subsoil types and areas to be stripped;
· Methods for stripping, stockpiling, respreading and improving soils;
· Haul routes;
· Location and content of each soil stockpile;
· Schedules of volumes for each material;
· Formation level decompaction measures;
· Soil re-spreading and decompaction;
· Soil dispersal (if necessary); and
· Who is responsible for supervising soil management.

Thereafter the development shall only be carried out in full accordance with the approved scheme.

Reason: Details are required prior to commencement of development, to mitigate impacts on geodiversity through avoiding the loss, damage or contamination of valuable soil resources and reduce impacts on climate change, whether the soil will be retained for future landscaping on-site, or used or sold off-site, in accordance with Policies CC1 and EE2 of the Central Bedfordshire Local Plan (2021) and the NPPF.


Return to Search | Close WindowTop of Page