| Conditions or Reasons: | | 1)
1. The development shall begin not later than five years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990. 2. Before the access is brought into use, a triangular vision splay shall be provided on each side of it measuring 1.8m along the fence, wall, hedge or other means of definition of the front boundary of the site, and 1.8m into the site at right angles to the same line along the side of the new access drive. The vision splays so provided and on land under the applicant's control shall be kept free of any obstruction to visibility exceeding a height of 600mm above the adjoining footway level. REASON: To provide adequate visibility between the existing highway and the proposed access(es) and to make the access(es) safe and convenient for the traffic which is likely to use it/them. (Policies T4, S.B.L.P, T1, S.B.L.P.F.R.D.). 3. Before the development is first occupied or brought into use, all on site vehicular areas shall be surfaced in accordance with details to be submitted to and approved in writing by the District Planning Authority so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway. REASON: To minimise danger, obstruction and inconvenience to users of the highway and of the premises. (Policies 42, B.S.P, T13, S.B.L.P, TI4, S.B.L.P.F.R.D.). 4. The development shall not be brought into use until a turning space for vehicles shall be constructed within the curtilage of the site in a manner to be approved in writing by the District Planning Authority and shall thereafter be retained for this purpose. REASON: To enable vehicles to draw off, park and turn outside the highway limits thereby avoiding the reversing of vehicles onto or from the highway. (Policies 42, B.S.P, T4, T13, S.B.L.P, T1, TI4, S.B.L.P.F.R.D.). 5. This permission relates only to the details shown on the Site Location Plan received 21/08/01 and Site Plan Drawing received 02/10/01 or to any subsequent appropriately endorsed revised plans. REASON: To identify the approved plans and to avoid doubt. INFORMATIVES: No works associated with the construction of the vehicular access should be carried out within the confines of the public highway without the prior consent, in writing, of the Development Planning and Control Group, Department of Environment and Economic Development, Bedfordshire County Council, County Hall, Bedford, MK42 9AP. If any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus, or structures (e.g. street name plates, bus stops, signs or shelters, statutory equipment etc.) then the applicant will be required to bear the cost of such removal or alteration. The requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Senior Engineer (Services), Network Maintenance Group, Highways and Transport Division, Department of Environment and Economic Development, Bedfordshire County Council, County Hall, Bedford, MK42 9AP. NOTE ---- In accordance with the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2000, the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (B.S.P.), South Bedfordshire Local Plan (S.B.L.P.) and South Bedfordshire Local Plan First Review Deposit (and Proposed Pre-Inquiry Changes) (S.B.L.P.F.R.D.) |
|
|---|