<< Back to case
Conditions or Reasons for Planning Application - SB/03/00021/FULL
Conditions or Reasons:
1) 1. The development shall begin not later than five years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990. 2. The external finish of the walls and roofing materials to be used for the extension shall match that of the existing building as closely as possible. REASON: To ensure that the development is in keeping with the existing building. (Policies 10, B.S.P; BE11, H9, S.B.L.P; BE8, H8, S.B.L.P.F.R.D.). 3. This permission relates only to the details shown on the Site Location Plan and Drawing No. LDA.6307 received 13/01/03 or to any subsequent appropriately endorsed revised plans. REASON: To identify the approved plans and to avoid doubt. NOTE ---- In accordance with the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2000, the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (B.S.P.), South Bedfordshire Local Plan (S.B.L.P.) and South Bedfordshire Local Plan First Review Deposit (and Proposed Modifications) (S.B.L.P.F.R.D.)


Return to Search | Close WindowTop of Page