1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - SB/04/00358

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:18 / 03 / 2004
Registration (Validation) Date:26 / 03 / 2004
Consultation Start Date:26 / 03 / 2004
Earliest Decision Date (Consultation Period Expires):No date
Target Date for Decision:21 / 05 / 2004
Location:14 PARK LANE, EATON BRAY, DUNSTABLE, LU6 2BB
Parish Name:Eaton Bray
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Officer Delegated
Description:ERECTION OF TWO STOREY SIDE EXTENSION TO PROVIDE ANNEXE ACCOMODATION, LOFT CONVERSION AND FRONT PORCH.
Case Officer:Mr M Saccoccio
Case Officer Tel:0300 300 5510
Case Officer Email:planning@centralbedfordshire.gov.uk
Status:Decided
Agent:SPITERI FORBER
TECHNICAL SERVICES
OSBORN HOUSE
20 HIGH STREET SOUTH
OLNEY, BUCKS
MK46 4AA
Press Date:No date
Site Notice Date:No date
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:05/04/2004
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:14 / 05 / 2004
Date Decision Despatched:14 / 05 / 2004
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 5 of the Town & Country Planning (General Development Procedure) (England) (Amendment) Order 2003, the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan (comprising of the Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review) and material considerations do not indicate otherwise. The policies which refer are as follows: Bedfordshire Structure Plan 2011 Policy 10 (Quality in Town and Country) South Bedfordshire Local Plan Review Policy H8 (Extensions to Dwellings) Policy BE8 (Design and Environmental Considerations)In accordance with Article 5 of the Town & Country Planning (General Development Procedure) (England) (Amendment) Order 2003, the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan (comprising of the Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review) and material considerations do not indicate otherwise. The policies which refer are as follows: Bedfordshire Structure Plan 2011 Policy 10 (Quality in Town and Country) South Bedfordshire Local Plan Review Policy H8 (Extensions to Dwellings) Policy BE8 (Design and Environmental Considerations)
2 )In accordance with the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2000, the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).In accordance with the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2000, the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).
3 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
4 )The applicant is advised by the Environment Agency of their responsibility to ensure that adequate residual capacity exists within the "existing" surface foul water drainage systems, to accept any additional discharge from the development without detriment to either the land drainage regime or water environment.The applicant is advised by the Environment Agency of their responsibility to ensure that adequate residual capacity exists within the "existing" surface foul water drainage systems, to accept any additional discharge from the development without detriment to either the land drainage regime or water environment.
5 )The Buckingham and River Ouzel Internal Drainage Board advise that soakaway drainage may not operate successfully in this area. If the applicant wishes to pursue this option then it is essential that ground conditions be investigated and if found satisfactory the soakaways constructed in accordance with the latest Building Research Establishment Digest.The Buckingham and River Ouzel Internal Drainage Board advise that soakaway drainage may not operate successfully in this area. If the applicant wishes to pursue this option then it is essential that ground conditions be investigated and if found satisfactory the soakaways constructed in accordance with the latest Building Research Establishment Digest.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page