| Details of Planning Application -
SB/04/01435/FULL |
| Application registered | Consultation period | Awaiting decision | Decided | Appeal | Appeal decided |
|
|---|
| Application Type: | Full Application |
|---|
| Date Received: | 10
/
11
/
2004 |
|---|
| Registration (Validation) Date: | 17
/
11
/
2004 |
|---|
| Consultation Start Date: | 17
/
11
/
2004 |
|---|
| Earliest Decision Date (Consultation Period Expires): | No date |
|---|
| Target Date for Decision: | 12
/
01
/
2005 |
|---|
| Location: | 53 WATERDELL, LEIGHTON BUZZARD, LU7 3PH |
|---|
| Parish Name: | Leighton-Linslade |
|---|
| Conservation Area: | Not available |
|---|
| Listed Building Grade: | Not available |
|---|
| Environmental Assessment: | None submitted or required |
|---|
| Expected Decision Level: | Officer Delegated |
|---|
| Description: | ERECTION OF SINGLE STOREY REAR EXTENSION AND DETACHED GARAGE. |
|---|
| Case Officer: | Not available |
|---|
| Status: | Decided |
|---|
| Agent: | MR R L WALLER |
|---|
| 20 CRANBORNE AVENUE |
|---|
| WESTCROFT |
|---|
| MILTON KEYNES |
|---|
| MK4 4DY |
|---|
| Press Date: | No date |
|---|
| Site Notice Date: | No date |
|---|
| Neighbours | Responses Received:
0 |
|---|
| and Representatives: | In Favour:
0 |
|---|
| Representation Details | Against:
0 |
|---|
| Comments:
0 |
|---|
| Petitions Against:
0 |
|---|
| Petitions For:
0 |
|---|
| Officer Site Visit Date: | 10/01/2005 |
|---|
| Committee Site Visit Date: | No date |
|---|
| Committee Meeting Date: | No date |
|---|
| Decision Level: | Officer Delegated |
|---|
| Date Decision Made: | 11
/
01
/
2005 |
|---|
| Date Decision Despatched: | 12
/
01
/
2005 |
|---|
| Decision: | Grant Planning Permission |
|---|
| Conditions or Reasons: | View Conditions or Reasons |
|---|
| Informative Notes: | | 1
)In accordance with Article 5 of the Town & Country Planning (General Development Procedure) (England) (Amendment) Order 2003, the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan (comprising of the Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review ) and material considerations do not indicate otherwise. The policies which refer are as follows:
Bedfordshire Structure Plan 2011
Policy 10 ¿ Quality in Town and Country
Policy 3 ¿ Water
South Bedfordshire Local Plan Review
BE8 ¿ Design Considerations
H8 ¿ Control of Extensions to Dwellings
IS3 ¿ Controlling Development in Areas at Risk of FloodingIn accordance with Article 5 of the Town & Country Planning (General Development Procedure) (England) (Amendment) Order 2003, the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan (comprising of the Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review ) and material considerations do not indicate otherwise. The policies which refer are as follows:
Bedfordshire Structure Plan 2011
Policy 10 ¿ Quality in Town and Country
Policy 3 ¿ Water
South Bedfordshire Local Plan Review
BE8 ¿ Design Considerations
H8 ¿ Control of Extensions to Dwellings
IS3 ¿ Controlling Development in Areas at Risk of Flooding |
| 2
)In accordance with the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2000, the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).In accordance with the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2000, the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR). |
| 3
)The Buckingham & River Ouzel Internal Drainage Board advise that it is essential that ground conditions be investigated and if found satisfactory, the soakaways constructed in accordance with the latest Building Research Establishment Digest.
In the event that ground conditions are found not to be suitable for soakaway drainage, any direct discharge to the nearby watercourse will require the Board's prior consent. Please contact the Internal Drainage Board at Cambridge House, Cambridge Road, Bedford, MK42 0LH - Telephone (01234 354396) - E-mail info@idbs.org.ukThe Buckingham & River Ouzel Internal Drainage Board advise that it is essential that ground conditions be investigated and if found satisfactory, the soakaways constructed in accordance with the latest Building Research Establishment Digest.
In the event that ground conditions are found not to be suitable for soakaway drainage, any direct discharge to the nearby watercourse will require the Board's prior consent. Please contact the Internal Drainage Board at Cambridge House, Cambridge Road, Bedford, MK42 0LH - Telephone (01234 354396) - E-mail info@idbs.org.uk |
| 4
)A Flood Risk Assessment (FRA) should be submitted to the LPA and to be acceptable as a FRA the applicant should confirm in writing as a minimum that:
EITHER
(1) Floor levels within the proposed development will be set no lower than existing levels AND,
(2) Flood proofing of the proposed development has been considered by the applicant and incorporated where appropriate.
OR
(3) Floor levels within the extension will be set 300mm above the known or modelled 1 in 100 year annual probability (1% chance) river flood level or 1 in 200 year annual probability(0.5% chance) tidal & coastal flood level. This must be demonstrated by a plan to Ordnance Datum/GPS showing finished floor levels relative to the known or modelled flood level.A Flood Risk Assessment (FRA) should be submitted to the LPA and to be acceptable as a FRA the applicant should confirm in writing as a minimum that:
EITHER
(1) Floor levels within the proposed development will be set no lower than existing levels AND,
(2) Flood proofing of the proposed development has been considered by the applicant and incorporated where appropriate.
OR
(3) Floor levels within the extension will be set 300mm above the known or modelled 1 in 100 year annual probability (1% chance) river flood level or 1 in 200 year annual probability(0.5% chance) tidal & coastal flood level. This must be demonstrated by a plan to Ordnance Datum/GPS showing finished floor levels relative to the known or modelled flood level. |
| 5
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
|
|---|
| Appeal Received Date: | This case has no appeals against it |
|---|
| Planning Obligation Status: | Not available |
|---|