1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - SB/04/01619

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Planning Application
Date Received:20 / 12 / 2004
Registration (Validation) Date:20 / 12 / 2004
Consultation Start Date:20 / 12 / 2004
Earliest Decision Date (Consultation Period Expires):No date
Target Date for Decision:14 / 02 / 2005
Location:119 HOCKLIFFE ROAD, LEIGHTON BUZZARD, LU7 3FL
Parish Name:Leighton Buzzard
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:None submitted or required
Expected Decision Level:Officer Delegated
Description:ERECTION OF TWO STOREY SIDE EXTENSION, AND REPOSITIONING OF CONSERVATORY TO REAR
Case Officer:Will Riley
Case Officer Tel:0845 849 6302
Case Officer Email:planning@centralbedfordshire.gov.uk
Status:Decided
Agent:D.V. JAMES
38 FAIRFIELD WAY
BROOCHES MEAD
STEVENAGE
HERTS
SG1 6BG
Press Date:No date
Site Notice Date:No date
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:10/01/2005
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:01 / 02 / 2005
Date Decision Despatched:03 / 02 / 2005
Decision:Grant Planning Permission
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 5 of the Town & Country Planning (General Development Procedure) (England) (Amendment) Order 2003, the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan (comprising of the Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review ) and material considerations do not indicate otherwise. The policies which refer are as follows: Bedfordshire Structure Plan 2011 Policy 3 ¿ Water Policy 10 ¿ Quality in Town and Country South Bedfordshire Local Plan Review BE8 ¿ Design Considerations H8 ¿ Control of Extensions to Dwellings IS3 ¿ Controlling Development in Areas at Risk of FloodingIn accordance with Article 5 of the Town & Country Planning (General Development Procedure) (England) (Amendment) Order 2003, the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan (comprising of the Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review ) and material considerations do not indicate otherwise. The policies which refer are as follows: Bedfordshire Structure Plan 2011 Policy 3 ¿ Water Policy 10 ¿ Quality in Town and Country South Bedfordshire Local Plan Review BE8 ¿ Design Considerations H8 ¿ Control of Extensions to Dwellings IS3 ¿ Controlling Development in Areas at Risk of Flooding
2 )In accordance with the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2000, the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).In accordance with the Town and Country Planning (General Development Procedure) (England) (Amendment) Order 2000, the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).
3 )A Flood Risk Assessment (FRA) should be submitted to the LPA and to be acceptable as a FRA the applicant should confirm in writing as a minimum that: EITHER (1) Floor levels within the proposed development will be set no lower than existing levels AND, (2) Flood proofing of the proposed development has been considered by the applicant and incorporated where appropriate. OR (3) Floor levels within the extension will be set 300mm above the known or modelled 1 in 100 year annual probability (1% chance) river flood level or 1 in 200 year annual probability(0.5% chance) tidal & coastal flood level. This must be demonstrated by a plan to Ordnance Datum/GPS showing finished floor levels relative to the indicative flood level.A Flood Risk Assessment (FRA) should be submitted to the LPA and to be acceptable as a FRA the applicant should confirm in writing as a minimum that: EITHER (1) Floor levels within the proposed development will be set no lower than existing levels AND, (2) Flood proofing of the proposed development has been considered by the applicant and incorporated where appropriate. OR (3) Floor levels within the extension will be set 300mm above the known or modelled 1 in 100 year annual probability (1% chance) river flood level or 1 in 200 year annual probability(0.5% chance) tidal & coastal flood level. This must be demonstrated by a plan to Ordnance Datum/GPS showing finished floor levels relative to the indicative flood level.
4 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page