1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - MB/03/00789/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Planning Application
Date Received:24 / 04 / 2003
Registration (Validation) Date:02 / 05 / 2003
Consultation Start Date:02 / 05 / 2003
Earliest Decision Date (Consultation Period Expires):23 / 05 / 2003
Target Date for Decision:27 / 06 / 2003
Location:50 Rectory Road, Steppingley, MK45 5AT
Parish Name:Steppingley
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Officer Delegated
Description:Full: Erection of single storey pool building, (revision to planning permission ref 02/1417/Full dated 3/12/2003 for two storey rear extension and single storey extension to house swimming pool)
Case Officer:Not available
Status:Decided
Agent:Nigel Burgess Associates
The Priory
Church Road
Westoning
Bedford
MK45 5SW
Press Date:16 / 05 / 2003
Site Notice Date:No date
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:No date
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:No date
Date Decision Despatched:13 / 06 / 2003
Decision:Full Conditional Approval
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )Swimming pool filter backwash should be passed to a soakaway or the foul drainage system, and not to a surface water sewer or watercourse.Swimming pool filter backwash should be passed to a soakaway or the foul drainage system, and not to a surface water sewer or watercourse.
2 )All surface water from roofs should be piped to an approved surface water system using sealed downpipes. Open gullies should not be used.All surface water from roofs should be piped to an approved surface water system using sealed downpipes. Open gullies should not be used.
3 )Only clean, uncontaminated surface water should be discharged to any soakaway, watercourse or surface water sewer.Only clean, uncontaminated surface water should be discharged to any soakaway, watercourse or surface water sewer.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page