| Details of Planning Application -
MB/04/01714/LB |
| Application registered | Consultation period | Awaiting decision | Decided | Appeal | Appeal decided |
|
|---|
| Application Type: | Listed Building Consent |
|---|
| Date Received: | 15
/
09
/
2004 |
|---|
| Registration (Validation) Date: | 15
/
09
/
2004 |
|---|
| Consultation Start Date: | 15
/
09
/
2004 |
|---|
| Earliest Decision Date (Consultation Period Expires): | 06
/
10
/
2004 |
|---|
| Target Date for Decision: | 10
/
11
/
2004 |
|---|
| Location: | 91 High Street, Biggleswade, SG18 0LA |
|---|
| Parish Name: | Biggleswade |
|---|
| Conservation Area: | Biggleswade |
|---|
| Listed Building Grade: | Grade 2 |
|---|
| Environmental Assessment: | Not available |
|---|
| Expected Decision Level: | Officer Delegated |
|---|
| Description: | Listed Building Consent: Repairs to stonework, repointing of brickwork and chemical cleaning of front parapet, chimneys and part of side elevation. |
|---|
| Case Officer: | Not available |
|---|
| Status: | Decided |
|---|
| Agent: | Not available |
|---|
| Press Date: | 01
/
10
/
2004 |
|---|
| Site Notice Date: | No date |
|---|
| Neighbours | Responses Received:
0 |
|---|
| and Representatives: | In Favour:
0 |
|---|
| Representation Details | Against:
0 |
|---|
| Comments:
0 |
|---|
| Petitions Against:
0 |
|---|
| Petitions For:
0 |
|---|
| Officer Site Visit Date: | 22/09/2004 |
|---|
| Committee Site Visit Date: | No date |
|---|
| Committee Meeting Date: | No date |
|---|
| Decision Level: | Officer Delegated |
|---|
| Date Decision Made: | No date |
|---|
| Date Decision Despatched: | 25
/
10
/
2004 |
|---|
| Decision: | Listed Building Consent |
|---|
| Conditions or Reasons: | View Conditions or Reasons |
|---|
| Informative Notes: | | 1
)Due to the proximity of the London-Edinburgh rail line and the associated dangers of high speed trains and overhead power lines, it is strongly advised that you submit full details of the proposed works including a site specific method statement and risk assessment to the Town and Country Planning Advisor at Network Rail, prior to any activity being undertaken to repair the roof or exterior of the building.
In addition, to ensure public safety, it may be necessary to co-ordinate the erection of scaffolding with times when no trains are running and the electrification current has been switched off. It is strongly advised that you contact Network Rail to discuss the implications and time for undertaking the proposed works.
Town and Country Planning Advisor
Asset Protection
Network Rail-LNE
A.101 Hudson House
Toft Green
York
YO1 6HPDue to the proximity of the London-Edinburgh rail line and the associated dangers of high speed trains and overhead power lines, it is strongly advised that you submit full details of the proposed works including a site specific method statement and risk assessment to the Town and Country Planning Advisor at Network Rail, prior to any activity being undertaken to repair the roof or exterior of the building.
In addition, to ensure public safety, it may be necessary to co-ordinate the erection of scaffolding with times when no trains are running and the electrification current has been switched off. It is strongly advised that you contact Network Rail to discuss the implications and time for undertaking the proposed works.
Town and Country Planning Advisor
Asset Protection
Network Rail-LNE
A.101 Hudson House
Toft Green
York
YO1 6HP |
|
|---|
| Appeal Received Date: | This case has no appeals against it |
|---|
| Planning Obligation Status: | Not available |
|---|