1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - MB/08/00681/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:16 / 04 / 2008
Registration (Validation) Date:16 / 04 / 2008
Consultation Start Date:16 / 04 / 2008
Earliest Decision Date (Consultation Period Expires):07 / 05 / 2008
Target Date for Decision:11 / 06 / 2008
Location:Unit 2, 8 Market Square, Potton, Sandy, SG19 2NP
Parish Name:Potton
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Officer Delegated
Description:Full: Erection of 5 no three bedroom houses and 1 no four bedroom house and access modifications and parking turning areas
Case Officer:Mark Spragg
Case Officer Tel:0300 300 6365
Case Officer Email:mark.spragg2@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr N Webb
92 Crawley Green Road
Luton
Beds
LU2 0QU
Press Date:25 / 04 / 2008
Site Notice Date:No date
NeighboursResponses Received: 5
and Representatives:In Favour: 0
Representation DetailsAgainst: 4
Comments: 1
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:No date
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:No date
Date Decision Despatched:11 / 06 / 2008
Decision:Full Conditional Approval
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )The applicant is advised that in order to comply with Condition 16 of this permission it will be necessary for the developer of the site to enter into an agreement with Bedfordshire County Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. Further details can be obtained from the Development Planning and Control Group, Bedfordshire County Council, County Hall, Bedford, MK42 9AP.The applicant is advised that in order to comply with Condition 16 of this permission it will be necessary for the developer of the site to enter into an agreement with Bedfordshire County Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. Further details can be obtained from the Development Planning and Control Group, Bedfordshire County Council, County Hall, Bedford, MK42 9AP.
2 )The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford, MK42 9AP.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford, MK42 9AP.
3 )The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford, MK42 9AP.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford, MK42 9AP.
4 )The applicant is advised that the County Council as highway authority will not consider the proposed on-site vehicular areas for adoption as highway maintainable at public expense.The applicant is advised that the County Council as highway authority will not consider the proposed on-site vehicular areas for adoption as highway maintainable at public expense.
5 )The applicant is advised of the need to maintain due care and attention during the course of development in respect of the Listed building located at the access, 6 Market Square. Any damage caused to the neighbouring property will be a civil matter. The developer may therefore wish to provide protection measures or to limit the size of construction vehicles using the access.The applicant is advised of the need to maintain due care and attention during the course of development in respect of the Listed building located at the access, 6 Market Square. Any damage caused to the neighbouring property will be a civil matter. The developer may therefore wish to provide protection measures or to limit the size of construction vehicles using the access.
6 )An acceptable method of foul drainage disposal would be connection to the public foul sewer.An acceptable method of foul drainage disposal would be connection to the public foul sewer.
7 )Where soakaways are proposed for the disposal of uncontaminated surface water, percolation tests should be undertaken, and soakaways designed and constructed in accordance with BRE Digest 365 (or CIRIA Report 156)Where soakaways are proposed for the disposal of uncontaminated surface water, percolation tests should be undertaken, and soakaways designed and constructed in accordance with BRE Digest 365 (or CIRIA Report 156)
8 )Only clean, uncontaminated surface water should be discharged to any soakaway, watercourse or surface water sewer.Only clean, uncontaminated surface water should be discharged to any soakaway, watercourse or surface water sewer.
9 )Site operators should ensure that there is no possibility of contaminated water entering and polluting surface or underground waters.Site operators should ensure that there is no possibility of contaminated water entering and polluting surface or underground waters.
10 )All surface water from roofs shall be piped direct to an approved surface water system using sealed downpipes. Open gullies should not be used.All surface water from roofs shall be piped direct to an approved surface water system using sealed downpipes. Open gullies should not be used.
11 )Any waste from the development must be re-used, re-cycled or otherwise disposed of in accordance with waste management legislation and in particular the Duty of Care.Any waste from the development must be re-used, re-cycled or otherwise disposed of in accordance with waste management legislation and in particular the Duty of Care.
12 )Any oil storage tank should be sited on an impervious base and surrounded by oil tight bunded walls with a capacity of 110% of the storage tank, to enclose all filling, drawing and overflow pipes.Any oil storage tank should be sited on an impervious base and surrounded by oil tight bunded walls with a capacity of 110% of the storage tank, to enclose all filling, drawing and overflow pipes.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page