| Informative Notes: | | 1
)The applicant is advised that in order to comply with Condition 16 of this permission it will be necessary for the developer of the site to enter into an agreement with Bedfordshire County Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. Further details can be obtained from the Development Planning and Control Group, Bedfordshire County Council, County Hall, Bedford, MK42 9AP.The applicant is advised that in order to comply with Condition 16 of this permission it will be necessary for the developer of the site to enter into an agreement with Bedfordshire County Council as Highway Authority under Section 278 of the Highways Act 1980 to ensure the satisfactory completion of the access and associated road improvements. Further details can be obtained from the Development Planning and Control Group, Bedfordshire County Council, County Hall, Bedford, MK42 9AP. |
| 2
)The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford, MK42 9AP.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford, MK42 9AP. |
| 3
)The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford, MK42 9AP.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford, MK42 9AP. |
| 4
)The applicant is advised that the County Council as highway authority will not consider the proposed on-site vehicular areas for adoption as highway maintainable at public expense.The applicant is advised that the County Council as highway authority will not consider the proposed on-site vehicular areas for adoption as highway maintainable at public expense. |
| 5
)The applicant is advised of the need to maintain due care and attention during the course of development in respect of the Listed building located at the access, 6 Market Square. Any damage caused to the neighbouring property will be a civil matter. The developer may therefore wish to provide protection measures or to limit the size of construction vehicles using the access.The applicant is advised of the need to maintain due care and attention during the course of development in respect of the Listed building located at the access, 6 Market Square. Any damage caused to the neighbouring property will be a civil matter. The developer may therefore wish to provide protection measures or to limit the size of construction vehicles using the access. |
| 6
)An acceptable method of foul drainage disposal would be connection to the public foul sewer.An acceptable method of foul drainage disposal would be connection to the public foul sewer. |
| 7
)Where soakaways are proposed for the disposal of uncontaminated surface water, percolation tests should be undertaken, and soakaways designed and constructed in accordance with BRE Digest 365 (or CIRIA Report 156)Where soakaways are proposed for the disposal of uncontaminated surface water, percolation tests should be undertaken, and soakaways designed and constructed in accordance with BRE Digest 365 (or CIRIA Report 156) |
| 8
)Only clean, uncontaminated surface water should be discharged to any soakaway, watercourse or surface water sewer.Only clean, uncontaminated surface water should be discharged to any soakaway, watercourse or surface water sewer. |
| 9
)Site operators should ensure that there is no possibility of contaminated water entering and polluting surface or underground waters.Site operators should ensure that there is no possibility of contaminated water entering and polluting surface or underground waters. |
| 10
)All surface water from roofs shall be piped direct to an approved surface water system using sealed downpipes. Open gullies should not be used.All surface water from roofs shall be piped direct to an approved surface water system using sealed downpipes. Open gullies should not be used. |
| 11
)Any waste from the development must be re-used, re-cycled or otherwise disposed of in accordance with waste management legislation and in particular the Duty of Care.Any waste from the development must be re-used, re-cycled or otherwise disposed of in accordance with waste management legislation and in particular the Duty of Care. |
| 12
)Any oil storage tank should be sited on an impervious base and surrounded by oil tight bunded walls with a capacity of 110% of the storage tank, to enclose all filling, drawing and overflow pipes.Any oil storage tank should be sited on an impervious base and surrounded by oil tight bunded walls with a capacity of 110% of the storage tank, to enclose all filling, drawing and overflow pipes. |
|
|---|