| Informative Notes: | | 1
)In accordance with Article 22 of the Town & Country Planning (General Development Procedure) Order 1995 (as Amended), the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan (comprising of the Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review ) and material considerations do not indicate otherwise. The policies which refer are as follows:
Bedfordshire Structure Plan 2011
Policies 8 (New Development), 10 (Quality in Town and Country), 25 (Infrastructure), 33 (Location of Housing) and 42 (Traffic Management).
South Bedfordshire Local Plan Review
Policies BE2 (Control of Development affecting Listed Building), BE8 (Design and Environmetnal Considerations), T1 (Controlling Location and Traffic Impact of Development), T10 (Controlling Parking in New Developments), H2 (Making Provision for Housing via Fall-in-Sites), H3 (Meeting Local Housing Needs), H6 (Housing Density), R10 (Childrens Play Area Standards), R11 (Provision of New Urban Open Space in New Residential Developments and IMP1 (Using Legal Agreements and Planning Obligations to Implement Plan).In accordance with Article 22 of the Town & Country Planning (General Development Procedure) Order 1995 (as Amended), the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan (comprising of the Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review ) and material considerations do not indicate otherwise. The policies which refer are as follows:
Bedfordshire Structure Plan 2011
Policies 8 (New Development), 10 (Quality in Town and Country), 25 (Infrastructure), 33 (Location of Housing) and 42 (Traffic Management).
South Bedfordshire Local Plan Review
Policies BE2 (Control of Development affecting Listed Building), BE8 (Design and Environmetnal Considerations), T1 (Controlling Location and Traffic Impact of Development), T10 (Controlling Parking in New Developments), H2 (Making Provision for Housing via Fall-in-Sites), H3 (Meeting Local Housing Needs), H6 (Housing Density), R10 (Childrens Play Area Standards), R11 (Provision of New Urban Open Space in New Residential Developments and IMP1 (Using Legal Agreements and Planning Obligations to Implement Plan). |
| 2
)In accordance with Article 22 of the Town and Country Planning (General Development Procedure) Order 1995 (as Amended), the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).In accordance with Article 22 of the Town and Country Planning (General Development Procedure) Order 1995 (as Amended), the reason for any condition above relates to the Policies as referred to in the Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR). |
| 3
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 4
)Where remedial measures are necessary, they should be managed with Part IIA of the Environmental Protection Act 1990 in mind. Encapsulation of any contaminants should be made on a risk-based assessment so that they are unlikely to be subject to future release to the environment.
All ground investigations shall be risk based and have regard to BS10175:2001 Investigation of Potentially Contaminated Sites ¿ Code of Practice and Environment Agency/NHBC R&D Publication 66 ¿ Guidance for the Safe Development of Housing on Land Affected by Contamination.
The applicant should adhere to CLR11: The Model Procedures for the Management of Land Contamination, which has been developed to provide the technical framework for applying a risk management process when dealing with land affected by contamination.
The applicants/agent¿s consulting engineers shall certify that decontamination and remediation of the site has been undertaken in accordance with any measures approved by the District Planning Authority.
The applicant shall advise the District Planning Authority of commencement of the works.
The applicant should also me made aware that the ownership of land shown to be contaminated may accrue legal and financial liabilities under Part IIA of the Environment Protection Act 1990. Such liabilities are maximised when ¿pollutant linkages¿ engender ¿pathways¿ for the contaminants to reach ¿receptors¿.
South Bedfordshire District Council has published its Contaminated Land Inspection Strategy in line with the Environmental Protection Act 1990: Part IIA and its definition thereof. No land within the district has yet been formally designated as being ¿contaminated¿. However, it should not be taken to imply that the property or adjoining land is free from contamination.
Please contact South Bedfordshire Environmental Health Service for any further information.Where remedial measures are necessary, they should be managed with Part IIA of the Environmental Protection Act 1990 in mind. Encapsulation of any contaminants should be made on a risk-based assessment so that they are unlikely to be subject to future release to the environment.
All ground investigations shall be risk based and have regard to BS10175:2001 Investigation of Potentially Contaminated Sites ¿ Code of Practice and Environment Agency/NHBC R&D Publication 66 ¿ Guidance for the Safe Development of Housing on Land Affected by Contamination.
The applicant should adhere to CLR11: The Model Procedures for the Management of Land Contamination, which has been developed to provide the technical framework for applying a risk management process when dealing with land affected by contamination.
The applicants/agent¿s consulting engineers shall certify that decontamination and remediation of the site has been undertaken in accordance with any measures approved by the District Planning Authority.
The applicant shall advise the District Planning Authority of commencement of the works.
The applicant should also me made aware that the ownership of land shown to be contaminated may accrue legal and financial liabilities under Part IIA of the Environment Protection Act 1990. Such liabilities are maximised when ¿pollutant linkages¿ engender ¿pathways¿ for the contaminants to reach ¿receptors¿.
South Bedfordshire District Council has published its Contaminated Land Inspection Strategy in line with the Environmental Protection Act 1990: Part IIA and its definition thereof. No land within the district has yet been formally designated as being ¿contaminated¿. However, it should not be taken to imply that the property or adjoining land is free from contamination.
Please contact South Bedfordshire Environmental Health Service for any further information. |
| 5
)No works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Bedfordshire County Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to write to Bedfordshire County Council's Customer Contact Centre, 6th Floor, Cauldwell Street, County Hall, Bedford, MK42 9AP quoting the Planning Application number and supplying a copy of the Decision Notice and a copy of the approved plan. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.No works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Bedfordshire County Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to write to Bedfordshire County Council's Customer Contact Centre, 6th Floor, Cauldwell Street, County Hall, Bedford, MK42 9AP quoting the Planning Application number and supplying a copy of the Decision Notice and a copy of the approved plan. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration. |
| 6
)If it is the intention to request the Bedfordshire County Council as Local Highway Authority, to adopt the proposed highways as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway and drainage arrangements, including run off calculations shall be submitted to the Development Planning and Control Group, Bedfordshire County Council, County Hall, Cauldwell Street, Bedford, MK42 9AP. No development shall commence until the details have been approved in writing and an Agreement made under Section 38 of the Highways Act 1980 is in place.If it is the intention to request the Bedfordshire County Council as Local Highway Authority, to adopt the proposed highways as maintainable at the public expense then details of the specification, layout and alignment, width and levels of the said highways together with all the necessary highway and drainage arrangements, including run off calculations shall be submitted to the Development Planning and Control Group, Bedfordshire County Council, County Hall, Cauldwell Street, Bedford, MK42 9AP. No development shall commence until the details have been approved in writing and an Agreement made under Section 38 of the Highways Act 1980 is in place. |
| 7
)The closure of existing access(es) shall include the reinstatement of the highway to include any footway, verge and kerbing in a manner to be agreed in writing with the Development Planning and Control Group, Bedfordshire County Council, County Hall, Cauldwell Street, Bedford, MK42 9AP. No work shall be carried out within the confines of the public highway without prior consent. The applicant will also be expected to bear all costs involved in closing the access(es).The closure of existing access(es) shall include the reinstatement of the highway to include any footway, verge and kerbing in a manner to be agreed in writing with the Development Planning and Control Group, Bedfordshire County Council, County Hall, Cauldwell Street, Bedford, MK42 9AP. No work shall be carried out within the confines of the public highway without prior consent. The applicant will also be expected to bear all costs involved in closing the access(es). |
| 8
)The requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford. MK42 9AP.The requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Bedfordshire Highways, Streetworks Co-ordination Unit, County Hall, Bedford. MK42 9AP. |
|
|---|