| Informative Notes: | | 1
)The applicant is advised that no works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council Highways Department. Upon receipt of this Notice of Planning Approval, the applicant is advised to seek approval from the Local Planning Authority for details of the proposed vehicular access junction in accordance with condition 2. Upon formal approval of details, the applicant is advised to contact Central Bedfordshire Council's Highway help Desk, Tel: 0300 300 8049 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Hickeys Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration. To fully discharge condition the applicant should provide evidence to the Local Planning Authority that Bedfordshire highways have undertaken the construction in accordance with the approved plan, before the development is brought into use.The applicant is advised that no works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council Highways Department. Upon receipt of this Notice of Planning Approval, the applicant is advised to seek approval from the Local Planning Authority for details of the proposed vehicular access junction in accordance with condition 2. Upon formal approval of details, the applicant is advised to contact Central Bedfordshire Council's Highway help Desk, Tel: 0300 300 8049 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Hickeys Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration. To fully discharge condition the applicant should provide evidence to the Local Planning Authority that Bedfordshire highways have undertaken the construction in accordance with the approved plan, before the development is brought into use. |
| 2
)The applicant is advised that photographs of the existing highway that is to be used for access and delivery of materials will be required by the Local Highway Authority. Any subsequent damage to the public highway resulting from the works as shown by the photographs, including damage caused by delivery vehicles to the works, will be made good to the satisfaction of the Local Highway Authority and at the expense of the applicant. Attention is drawn to Section 59 of the Highways Act 1980 in this respect. (HN xi)The applicant is advised that photographs of the existing highway that is to be used for access and delivery of materials will be required by the Local Highway Authority. Any subsequent damage to the public highway resulting from the works as shown by the photographs, including damage caused by delivery vehicles to the works, will be made good to the satisfaction of the Local Highway Authority and at the expense of the applicant. Attention is drawn to Section 59 of the Highways Act 1980 in this respect. (HN xi) |
| 3
)The contractor and /or client are to ensure that any building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway.The contractor and /or client are to ensure that any building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway. |
| 4
)The applicant is advised that two parking spaces should be provided to the front of the site measuring 2.5m x 5.0m each and be surfaced in bituminous or other similar durable material for a distance of 5.0m into the site, measured from the highways boundary. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway.The applicant is advised that two parking spaces should be provided to the front of the site measuring 2.5m x 5.0m each and be surfaced in bituminous or other similar durable material for a distance of 5.0m into the site, measured from the highways boundary. Arrangements shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway. |
|
|---|