Details of Planning Application -
CB/15/00275/OUT |
Application registered | Consultation period | Awaiting decision | Decided | Appeal | Appeal decided |
|
---|
Application Type: | Outline Application |
---|
Date Received: | 27
/
01
/
2015 |
---|
Registration (Validation) Date: | 02
/
02
/
2015 |
---|
Consultation Start Date: | 02
/
02
/
2015 |
---|
Earliest Decision Date (Consultation Period Expires): | 22
/
12
/
2015 |
---|
Target Date for Decision: | 04
/
05
/
2015 |
---|
Location: | Prebendal Farm, Grove Road, Slip End, Luton, LU1 4BZ |
---|
Parish Name: | Slip End |
---|
Conservation Area: | Not available |
---|
Listed Building Grade: | Not available |
---|
Environmental Assessment: | Not available |
---|
Expected Decision Level: | Not available |
---|
Description: | Outline Development: Redevelopment of land previously used as a farm yard to residential use for 8 detached houses (market) and 4 semi detached houses (social use). |
---|
Case Officer: | Nicola McPhee |
---|
Case Officer Tel: | 0300 300 4112 |
---|
Case Officer Email: | Nicola.McPhee@centralbedfordshire.gov.uk |
---|
Status: | Decided |
---|
Agent: | Mr R Harrington |
---|
| First Floor |
---|
| 12 Church Square |
---|
| Leighton Buzzard |
---|
| Bedfordshire |
---|
| LU7 1AE |
---|
Press Date: | 08
/
02
/
2015 |
---|
Site Notice Date: | 19
/
02
/
2015 |
---|
Neighbours | Responses Received:
1 |
---|
and Representatives: | In Favour:
0 |
---|
Representation Details | Against:
1 |
---|
| Comments:
0 |
---|
| Petitions Against:
0 |
---|
| Petitions For:
0 |
---|
Officer Site Visit Date: | 15/04/2015 |
---|
Committee Site Visit Date: | 14/09/2015 |
---|
Committee Meeting Date: | 16
/
09
/
2015 |
---|
Decision Level: | Development Management Committee |
---|
Date Decision Made: | 26
/
01
/
2016 |
---|
Date Decision Despatched: | 27
/
01
/
2016 |
---|
Decision: | Outline Application - Granted |
---|
Conditions or Reasons: | View Conditions or Reasons |
---|
Informative Notes: | 1
)In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF). |
2
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
3
)The applicant is adivsed that piling or any other foundation designs using penetrative methods can result in risks to controlled waters. It should be demonstrated that any proposed piling will not result in contamination of groundwater.The applicant is adivsed that piling or any other foundation designs using penetrative methods can result in risks to controlled waters. It should be demonstrated that any proposed piling will not result in contamination of groundwater. |
4
)The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration Sustainable Drainage Systems (SUDS).The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration Sustainable Drainage Systems (SUDS). |
5
)This permission is subject to a legal obligation under Section 106 of The Town and Country Planning Act 1990.This permission is subject to a legal obligation under Section 106 of The Town and Country Planning Act 1990. |
|
---|
Appeal Received Date: | This case has no appeals against it |
---|
Planning Obligation Status: | Not available |
---|