| Informative Notes: | | 1
)The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Traffic Management Group Highways and Transport Division, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford, Bedfordshire, SG17 5TQ.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Traffic Management Group Highways and Transport Division, Central Bedfordshire Council, Priory House, Monks Walk, Chicksands, Shefford, Bedfordshire, SG17 5TQ. |
| 2
)The contractor and / or client are to ensure that any building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising for construction vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway.The contractor and / or client are to ensure that any building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising for construction vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway. |
| 3
)The applicant is advised that, under the provisions of the Highways Act 1980, no part of the structure, including posts and foundations shall be erected or installed in, under or overhanging the public highway and no door or gate shall be fixed so as to open outwards into the highway. Further information of the extent of the public highway can be obtained by contacting the highway searches officer; pedro.veiga@centralbedfordshire.gov.uk
The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway.The applicant is advised that, under the provisions of the Highways Act 1980, no part of the structure, including posts and foundations shall be erected or installed in, under or overhanging the public highway and no door or gate shall be fixed so as to open outwards into the highway. Further information of the extent of the public highway can be obtained by contacting the highway searches officer; pedro.veiga@centralbedfordshire.gov.uk
The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway. |
| 4
)The applicant is advised that parking for contractors vehicles and the storage of materials associated with their development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk on 0300 300 8049. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the pubic highway as a result of construction of the development hereby approved.The applicant is advised that parking for contractors vehicles and the storage of materials associated with their development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk on 0300 300 8049. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the pubic highway as a result of construction of the development hereby approved. |
| 5
)The property is within Flood Zone 3. The internal Drainage board suggest that the proposed environmental barrier has a gap of 100mm between the ground and underside of each fence panel to prevent water being trapped behind the barrier.The property is within Flood Zone 3. The internal Drainage board suggest that the proposed environmental barrier has a gap of 100mm between the ground and underside of each fence panel to prevent water being trapped behind the barrier. |
|
|---|