1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/15/04797/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:15 / 12 / 2015
Registration (Validation) Date:16 / 12 / 2015
Consultation Start Date:16 / 12 / 2015
Earliest Decision Date (Consultation Period Expires):02 / 02 / 2016
Target Date for Decision:10 / 02 / 2016
Location:Newton Grove Farm, Sutton Road, Dunton, Biggleswade, SG18 8RA
Parish Name:Dunton
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Change of use of land from Agricultural Land to Open Storage, Haulage Yard and Landscaping extension to existing HGV Haulage Yard.
Case Officer:Donna Lavender
Case Officer Tel:0300 300 5095
Case Officer Email:donna.lavender@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr Martin Humberstone
57 London Road
Biggleswade
Beds
SG18 8EU
Press Date:08 / 01 / 2016
Site Notice Date:21 / 12 / 2015
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:21/12/2015
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:10 / 02 / 2016
Date Decision Despatched:10 / 02 / 2016
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )Environment Agency - Notes to applicant (to assist in discharge of conditions 3 & 5) Any facilities, above ground, for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge into the bund.    Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from lorry parks and/or parking areas for fifty car park spaces or more and hardstandings should be passed through an oil interceptor designed compatible with the site being drained. Roof water shall not pass through the interceptor.    Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hard standings susceptible to oil contamination shall be passed through an oil separator designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor.    Foul and surface water manhole covers should be marked to enable easy recognition, convention is red for foul and blue for surface water. This is to enable water pollution incidents to be more readily traced.    The Environmental Permitting Regulations make it an offence to cause or knowingly permit any discharge that will result in the input of pollutants to surface waters or groundwater. Please find pollution prevention guidance at the following link: https://www.gov.uk/government/collections/pollution-prevention-guidance-ppgEnvironment Agency - Notes to applicant (to assist in discharge of conditions 3 & 5) Any facilities, above ground, for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge into the bund.    Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from lorry parks and/or parking areas for fifty car park spaces or more and hardstandings should be passed through an oil interceptor designed compatible with the site being drained. Roof water shall not pass through the interceptor.    Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hard standings susceptible to oil contamination shall be passed through an oil separator designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor.    Foul and surface water manhole covers should be marked to enable easy recognition, convention is red for foul and blue for surface water. This is to enable water pollution incidents to be more readily traced.    The Environmental Permitting Regulations make it an offence to cause or knowingly permit any discharge that will result in the input of pollutants to surface waters or groundwater. Please find pollution prevention guidance at the following link: https://www.gov.uk/government/collections/pollution-prevention-guidance-ppg
4 )No materials or vehicles associated with the development should be left on or near the public footpath which may cause a hazard or inconvenience to users. The applicant must ensure that there is no encroachment beyond the property's legal boundary onto the width of the public footpath. However if a footpath closure is needed this will require at least six weeks notice.No materials or vehicles associated with the development should be left on or near the public footpath which may cause a hazard or inconvenience to users. The applicant must ensure that there is no encroachment beyond the property's legal boundary onto the width of the public footpath. However if a footpath closure is needed this will require at least six weeks notice.
5 )The applicant is advised that parking for contractor's vehicles, deliveries and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk on 03003008049. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of construction of the development hereby approvedThe applicant is advised that parking for contractor's vehicles, deliveries and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk on 03003008049. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of construction of the development hereby approved
6 )Best practical means shall be taken at all times to ensure that all vehicles leaving the development site during construction of the development are in a condition such as not emit dust or deposit mud, slurry or other debris on the highway, in particular efficient means shall be installed prior to commencement of the development and thereafter maintained and employed at all times during construction of the development of cleaning the wheels of all vehicles leaving the siteBest practical means shall be taken at all times to ensure that all vehicles leaving the development site during construction of the development are in a condition such as not emit dust or deposit mud, slurry or other debris on the highway, in particular efficient means shall be installed prior to commencement of the development and thereafter maintained and employed at all times during construction of the development of cleaning the wheels of all vehicles leaving the site
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page