1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/16/00181/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:03 / 01 / 2016
Registration (Validation) Date:28 / 01 / 2016
Consultation Start Date:28 / 01 / 2016
Earliest Decision Date (Consultation Period Expires):30 / 06 / 2016
Target Date for Decision:28 / 04 / 2016
Location:Land to the rear of 33 to 57 Shortmead Street, Biggleswade, SG18 0AT
Parish Name:Biggleswade
Conservation Area:Biggleswade
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Construction of 30 No. dwellings and associated road, demolition of commercial premises.
Case Officer:Nikolas Smith
Case Officer Tel:07737 671137
Case Officer Email:nikolas.smith2@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr S Copson
Unit 5
Twigden Barns
Creaton
Northampton, Northamptonshire
NN6 8NN
Press Date:12 / 02 / 2016
Site Notice Date:04 / 02 / 2016
NeighboursResponses Received: 27
and Representatives:In Favour: 0
Representation DetailsAgainst: 20
Comments: 4
Petitions Against: 3
Petitions For: 0
Officer Site Visit Date:04/02/2016
Committee Site Visit Date:No date
Committee Meeting Date:20 / 07 / 2016
Decision Level:Development Management Committee
Date Decision Made:23 / 03 / 2017
Date Decision Despatched:23 / 03 / 2017
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk on 03003008049. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of construction of the development hereby approved.The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk on 03003008049. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of construction of the development hereby approved.
2 )Any unexpected contamination discovered during works should immediately be brought to the attention of the Planning Authority.Any unexpected contamination discovered during works should immediately be brought to the attention of the Planning Authority.
3 )The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to.The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to.
4 )Applicants are reminded that, should groundwater or surface water courses be at risk of contamination before, during or after development, the Environment Agency should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission.Applicants are reminded that, should groundwater or surface water courses be at risk of contamination before, during or after development, the Environment Agency should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page