| Informative Notes: | | 1
)In accordance with Article 22 of the Town & Country Planning (General Development Procedure) Order 1995 (as Amended), the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan comprising of the Regional Spatial Strategy for the East of England (the East of England Plan and the Milton Keynes and South Midlands Sub-Regional Strategy), Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review and material considerations do not indicate otherwise. The policies which refer are as follows:
East of England Plan (May 2008)
SS1 Achieving sustainable development
SS7 Green Belt
ENV7 Quality in the Built Environment
Milton Keynes and South Midlands Sub-Regional Strategy (March 2005).
South Bedfordshire Local Plan Review Policies
GB3 (Green Belt Villages Chalton Category 2 limited infilling, redevelopment and extensions to non-residential properties)
BE8 (Design Considerations)In accordance with Article 22 of the Town & Country Planning (General Development Procedure) Order 1995 (as Amended), the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan comprising of the Regional Spatial Strategy for the East of England (the East of England Plan and the Milton Keynes and South Midlands Sub-Regional Strategy), Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review and material considerations do not indicate otherwise. The policies which refer are as follows:
East of England Plan (May 2008)
SS1 Achieving sustainable development
SS7 Green Belt
ENV7 Quality in the Built Environment
Milton Keynes and South Midlands Sub-Regional Strategy (March 2005).
South Bedfordshire Local Plan Review Policies
GB3 (Green Belt Villages Chalton Category 2 limited infilling, redevelopment and extensions to non-residential properties)
BE8 (Design Considerations) |
| 2
)In accordance with Article 22 of the Town and Country Planning (General Development Procedure) Order 1995 (as Amended), the reason for any condition above relates to the Policies as referred to in the Regional Spatial Strategy (RSS), Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).In accordance with Article 22 of the Town and Country Planning (General Development Procedure) Order 1995 (as Amended), the reason for any condition above relates to the Policies as referred to in the Regional Spatial Strategy (RSS), Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR). |
| 3
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 4
)No works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to write to Central Bedfordshire Council's Customer Contact Centre, 6th Floor, Borough Hall, Bedford, MK42 9AP quoting the Planning Application number and supplying a copy of the Decision Notice and a copy of the approved plan. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.No works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to write to Central Bedfordshire Council's Customer Contact Centre, 6th Floor, Borough Hall, Bedford, MK42 9AP quoting the Planning Application number and supplying a copy of the Decision Notice and a copy of the approved plan. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration. |
| 5
)The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Central Bedfordshire Highways, Streetworks Co-ordination Unit, Priory House, Monks Walk, Chicksands, Shefford, Beds, SG17 5TQ.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Central Bedfordshire Highways, Streetworks Co-ordination Unit, Priory House, Monks Walk, Chicksands, Shefford, Beds, SG17 5TQ. |
|
|---|