1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/16/03224/VOC

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Variation of Condition
Date Received:20 / 07 / 2016
Registration (Validation) Date:28 / 07 / 2016
Consultation Start Date:28 / 07 / 2016
Earliest Decision Date (Consultation Period Expires):13 / 09 / 2016
Target Date for Decision:27 / 10 / 2016
Location:Brickyard Quarry, Grovebury Road, Leighton Buzzard, LU7 4SQ
Parish Name:Leighton-Linslade
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Removal of Conditions 19 and 20 and variations to conditions 27 and 35 attached to planning permission reference CB/11/00501/OUT dated 19th August 2011 (for Outline planning permission for up to 165 dwellings and associated infrastructure). The removal of conditions 19 and 20 would allow for the access to the site to be taken via Bellona Drive and a section at the southern end of Grovebury Lane rather than Vesta Grove. Variations to conditions 27 and 35 would allow application material to be submitted alongside an application for Reserved Matters, rather than in advance of one and to reflect the fact that some details submitted with the Outline application were indicative only.
Case Officer:Debbie Quinn
Case Officer Tel:0300 300 5723
Case Officer Email:debbie.quinn@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr J Brindley
6 The Gavel Centre
Porters Wood
St Albans
AL3 6PQ
Press Date:23 / 08 / 2016
Site Notice Date:11 / 08 / 2016
NeighboursResponses Received: 6
and Representatives:In Favour: 1
Representation DetailsAgainst: 4
Comments: 1
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:No date
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:04 / 08 / 2017
Date Decision Despatched:04 / 08 / 2017
Decision:Variation of Condition - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
2 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).
3 )Environment Agency Informative 1: Once final restoration levels are achieved we would expect the Environmental Permit Holder to be progressing towards definitive closure of the landfill. An assessment of the stability of the waste mass and emissions to the environment would be required to be undertaken by the permit holder. Additional remediation works or installation of monitoring infrastructure may be required. The applicant is advised that the proposed development should not have a detrimental impact on the requirements of the Environmental Permit and the achievement of definitive closure. We would expect to see significant progress towards or beyond definitive closure prior to the submission of a Reserved Matters application.Environment Agency Informative 1: Once final restoration levels are achieved we would expect the Environmental Permit Holder to be progressing towards definitive closure of the landfill. An assessment of the stability of the waste mass and emissions to the environment would be required to be undertaken by the permit holder. Additional remediation works or installation of monitoring infrastructure may be required. The applicant is advised that the proposed development should not have a detrimental impact on the requirements of the Environmental Permit and the achievement of definitive closure. We would expect to see significant progress towards or beyond definitive closure prior to the submission of a Reserved Matters application.
4 )The Environment Agency recommend that developers should: 1. Follow the risk management framework provided in CLR11, Model Procedures for the Management of Land Contamination, when dealing with land affected/potentially affected by contamination. 2. Refer to our Guiding principles for land contamination (GPLC1) for the type of information that we require in order to assess risks to controlled waters from the site. At this stage, a Preliminary Risk Assessment is required. The information contained in the GroundSure, Wilbourn Associates and Goldfinch Environmental Ltd reports should form the basis of the assessment. The Local Authority can advise on risk to other receptors, e.g. human health. 3. Refer to the Environment Agency's website at www.environment-agency.gov.uk 4. Land contamination investigations should be carried out in accordance with BS 5930:1999 'Code of Practice for site investigations' and BS 10175:2001 'Investigation of potentially contaminated sites - Code of Practice'. Soil and water analysis should be fully MCERTS accredited. 5. Site investigation works should be undertaken by a suitably qualified professional.The Environment Agency recommend that developers should: 1. Follow the risk management framework provided in CLR11, Model Procedures for the Management of Land Contamination, when dealing with land affected/potentially affected by contamination. 2. Refer to our Guiding principles for land contamination (GPLC1) for the type of information that we require in order to assess risks to controlled waters from the site. At this stage, a Preliminary Risk Assessment is required. The information contained in the GroundSure, Wilbourn Associates and Goldfinch Environmental Ltd reports should form the basis of the assessment. The Local Authority can advise on risk to other receptors, e.g. human health. 3. Refer to the Environment Agency's website at www.environment-agency.gov.uk 4. Land contamination investigations should be carried out in accordance with BS 5930:1999 'Code of Practice for site investigations' and BS 10175:2001 'Investigation of potentially contaminated sites - Code of Practice'. Soil and water analysis should be fully MCERTS accredited. 5. Site investigation works should be undertaken by a suitably qualified professional.
5 )We recommend that developers should: 1)  Follow the risk management framework provided in CLR11, Model Procedures for the Management of Land Contamination, when dealing with land affected by contamination. 2) Refer to the Environment Agency Guiding Principles for Land Contamination Reports for the type of information that we require in order to assess risks to controlled waters from the site. The Local Authority can advise on risk to other receptors, e.g. human health. 3) Refer to the Environment Agency's website at www.environment-agency.gov.uk for more information.We recommend that developers should: 1)  Follow the risk management framework provided in CLR11, Model Procedures for the Management of Land Contamination, when dealing with land affected by contamination. 2) Refer to the Environment Agency Guiding Principles for Land Contamination Reports for the type of information that we require in order to assess risks to controlled waters from the site. The Local Authority can advise on risk to other receptors, e.g. human health. 3) Refer to the Environment Agency's website at www.environment-agency.gov.uk for more information.
6 )We recommend that piling on contaminated sites underlain by aquifers is avoided where possible, and that non-invasive methods, such as rafts, should be used instead. Where there is no alternative to piling, a method should be selected that minimises the risks of groundwater pollution or gas migration. Mitigation measures and/or environmental monitoring may need to be incorporated into the design. The method selected should be presented in a " Foundation Works Risk Assessment Report" which should be submitted to and approved by the Local Planning Authority before development commences. We recommend that piling on contaminated sites underlain by aquifers is avoided where possible, and that non-invasive methods, such as rafts, should be used instead. Where there is no alternative to piling, a method should be selected that minimises the risks of groundwater pollution or gas migration. Mitigation measures and/or environmental monitoring may need to be incorporated into the design. The method selected should be presented in a " Foundation Works Risk Assessment Report" which should be submitted to and approved by the Local Planning Authority before development commences. 
7 )We offer the following information on the design and location of sustainable drainage systems: Direct discharges into groundwater of surface water run-off are not acceptable. All infiltration structures (permeable pavements, infiltration trenches, soakaways, etc.) should be constructed to as shallow a depth as possible to simulate natural infiltration.   The base of infiltration structures should be at least 1.2 metres above the highest seasonal groundwater-table as direct discharges to groundwater are unacceptable.    No infiltration structures should be constructed in contaminated land.   Prior to being discharged into any surface water sewer or soakaway system, all surface water drainage from parking areas and hard standings susceptible to oil contamination should be passed through an oil separator designed and constructed to have a capacity and details compatible with the site being drained. Roof water should not pass through the interceptor.   Only clean, uncontaminated water should be discharged to any soakaway/ infiltration structure. We consider that deep bore and other deep soakaway systems are not appropriate in areas where groundwater constitutes a significant resource (i.e. where aquifer yield may support or already supports abstraction).   Drainage systems should be constructed in line with guidance provided in CIRIA C697 as well as referring to the details given in C609 referred to above. C522 replacement (prior to publication, 2006, refer to CIRIA Report 609).We offer the following information on the design and location of sustainable drainage systems: Direct discharges into groundwater of surface water run-off are not acceptable. All infiltration structures (permeable pavements, infiltration trenches, soakaways, etc.) should be constructed to as shallow a depth as possible to simulate natural infiltration.   The base of infiltration structures should be at least 1.2 metres above the highest seasonal groundwater-table as direct discharges to groundwater are unacceptable.    No infiltration structures should be constructed in contaminated land.   Prior to being discharged into any surface water sewer or soakaway system, all surface water drainage from parking areas and hard standings susceptible to oil contamination should be passed through an oil separator designed and constructed to have a capacity and details compatible with the site being drained. Roof water should not pass through the interceptor.   Only clean, uncontaminated water should be discharged to any soakaway/ infiltration structure. We consider that deep bore and other deep soakaway systems are not appropriate in areas where groundwater constitutes a significant resource (i.e. where aquifer yield may support or already supports abstraction).   Drainage systems should be constructed in line with guidance provided in CIRIA C697 as well as referring to the details given in C609 referred to above. C522 replacement (prior to publication, 2006, refer to CIRIA Report 609).
8 )As part of the Reserved Matters the applicant will have to provide additional information on: Bin collection points for individual dwellings Tracking details, including details of any turning heads Individual dwellings access to the rear gardens in order to store waste receptacles Any communal bin store details including size, design and distance from highway In the submitted Waste Audit section 5.4 it states that "Communal refuse bins will be stored within 25 metres of the refuse collection routes" The Council requires that all communal bin stores are positioned no further than a maximum of 10 metres from highway.As part of the Reserved Matters the applicant will have to provide additional information on: Bin collection points for individual dwellings Tracking details, including details of any turning heads Individual dwellings access to the rear gardens in order to store waste receptacles Any communal bin store details including size, design and distance from highway In the submitted Waste Audit section 5.4 it states that "Communal refuse bins will be stored within 25 metres of the refuse collection routes" The Council requires that all communal bin stores are positioned no further than a maximum of 10 metres from highway.
9 )The development of the site is subject to a Planning Obligation under Section 106 of the Town and Country Planning Act 1990 (as amended).The development of the site is subject to a Planning Obligation under Section 106 of the Town and Country Planning Act 1990 (as amended).
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page