1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/16/04095/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:05 / 09 / 2016
Registration (Validation) Date:09 / 09 / 2016
Consultation Start Date:09 / 09 / 2016
Earliest Decision Date (Consultation Period Expires):28 / 12 / 2016
Target Date for Decision:09 / 12 / 2016
Location:Corner Farm, The Lynch, Kensworth, Dunstable, LU6 3QZ
Parish Name:Kensworth
Conservation Area:Kensworth Lynch
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:New agricultural storage building and hardstanding apron to serve existing agricultural operation incorporating landscaping, planting and scheme of surface drainage
Case Officer:Peter Vosper
Case Officer Tel:0300 300 4157
Case Officer Email:peter.vosper@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr A Munro
118 Bromham Road
Bedford
MK40 2QN
Press Date:12 / 10 / 2016
Site Notice Date:03 / 10 / 2016
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:03/10/2016
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:26 / 01 / 2017
Date Decision Despatched:26 / 01 / 2017
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )The Council does not accept materials at their offices. Where there is a requirement for materials to be submitted to and approved in writing by the Local Planning Authority, please contact the Case Officer to arrange for them to be viewed, usually this will be on site.The Council does not accept materials at their offices. Where there is a requirement for materials to be submitted to and approved in writing by the Local Planning Authority, please contact the Case Officer to arrange for them to be viewed, usually this will be on site.
4 )The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from The Street Works Co-ordinator, Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8049.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from The Street Works Co-ordinator, Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8049.
5 )The landscape scheme required by condition 9 shall be prepared by a suitably qualified landscape architect, in order to successfully implement the wildflower meadow, which is a skilled operation and needs precise working practices.The landscape scheme required by condition 9 shall be prepared by a suitably qualified landscape architect, in order to successfully implement the wildflower meadow, which is a skilled operation and needs precise working practices.
6 )In respect of the surface water drainage scheme, the following recommendations are made: i) Detailed site investigation results (including any site specific soakage tests and ground water monitoring shown in accordance with BRE 365) will need to be provided with the detailed design. ii) Permeable paving is a better solution, this allows pollution control and also provides storage reducing the size of soakaway required. iii) Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement'. iv) The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). v) To ensure future and subsequent owners will be aware of any maintenance requirements / responsibilities for surface water drainage, designation/registration of the SuDS should be carried out so that it appears as a Land Charge for the property and as such is identified to subsequent purchasers of the property. Any methods involving designation or registering a Land Charge are to be agreed with the LPA. vi) Please note that Land Drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse, and details of this should be provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.In respect of the surface water drainage scheme, the following recommendations are made: i) Detailed site investigation results (including any site specific soakage tests and ground water monitoring shown in accordance with BRE 365) will need to be provided with the detailed design. ii) Permeable paving is a better solution, this allows pollution control and also provides storage reducing the size of soakaway required. iii) Where the use of permeable surfacing is proposed, this should be designed in accordance with the 'CIRIA RP992 The SuDS Manual Update: Paper RP992/28: Design Assessment Checklists for Permeable/Porous Pavement'. iv) The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). v) To ensure future and subsequent owners will be aware of any maintenance requirements / responsibilities for surface water drainage, designation/registration of the SuDS should be carried out so that it appears as a Land Charge for the property and as such is identified to subsequent purchasers of the property. Any methods involving designation or registering a Land Charge are to be agreed with the LPA. vi) Please note that Land Drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse, and details of this should be provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.
7 )The applicant should address the following concerns when submitting details to discharge condition 12: 1. Infiltration is the likely method of dealing with surface water run off. There is no evidence in the form of a detailed ground investigation report to confirm that the ground is suitable for infiltration drainage. An infiltration test and report should be carried out to BRE Digest 365 to determine if soakaways or similar features can be used on any part of the site. Ground water is expected to be <3m from the surface at some times of the year. 2. Details of the final proposed impermeable area, peak flow rate and storage requirement, with full calculations and methodology. The scheme to be submitted shall include provision of attenuation for the 1 in 100 year event (+30% for climate change) and demonstrate that the surface water runoff generated during rainfall events up to and including the 1 in 100 years rainfall event (to include for climate change and urbancreep) will not exceed the run-off from the undeveloped site following the corresponding rainfall event.The applicant should address the following concerns when submitting details to discharge condition 12: 1. Infiltration is the likely method of dealing with surface water run off. There is no evidence in the form of a detailed ground investigation report to confirm that the ground is suitable for infiltration drainage. An infiltration test and report should be carried out to BRE Digest 365 to determine if soakaways or similar features can be used on any part of the site. Ground water is expected to be <3m from the surface at some times of the year. 2. Details of the final proposed impermeable area, peak flow rate and storage requirement, with full calculations and methodology. The scheme to be submitted shall include provision of attenuation for the 1 in 100 year event (+30% for climate change) and demonstrate that the surface water runoff generated during rainfall events up to and including the 1 in 100 years rainfall event (to include for climate change and urbancreep) will not exceed the run-off from the undeveloped site following the corresponding rainfall event.
8 )The developer should address risks to controlled waters from contamination at the site, following the requirements of the National Planning Policy Framework and the Environment Agency Guiding Principles for Land Contamination, which can be found here: https://www.gov.uk/government/publications/managing-and-reducing-land-contaminationThe developer should address risks to controlled waters from contamination at the site, following the requirements of the National Planning Policy Framework and the Environment Agency Guiding Principles for Land Contamination, which can be found here: https://www.gov.uk/government/publications/managing-and-reducing-land-contamination
9 )The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration (SuDS). The Environment Agency consider any infiltration (SuDS) greater than 2.0 m below ground level to be a deep system and are generally not acceptable. All infiltration SuDS require a minimum of 1.2 m clearance between the base of infiltration SuDS and peak seasonal groundwater levels. All need to meet the criteria in the Environment Agency's Groundwater Protection: Principles and Practice (GP3) position statements G1 to G13 which can be found here: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/297347/LIT_7660_9a3742.pdf. In addition, they must not be constructed in ground affected by contamination.The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration (SuDS). The Environment Agency consider any infiltration (SuDS) greater than 2.0 m below ground level to be a deep system and are generally not acceptable. All infiltration SuDS require a minimum of 1.2 m clearance between the base of infiltration SuDS and peak seasonal groundwater levels. All need to meet the criteria in the Environment Agency's Groundwater Protection: Principles and Practice (GP3) position statements G1 to G13 which can be found here: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/297347/LIT_7660_9a3742.pdf. In addition, they must not be constructed in ground affected by contamination.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page