1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/16/04725/FULL

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full Application
Date Received:12 / 10 / 2016
Registration (Validation) Date:12 / 10 / 2016
Consultation Start Date:12 / 10 / 2016
Earliest Decision Date (Consultation Period Expires):25 / 11 / 2016
Target Date for Decision:07 / 12 / 2016
Location:Land adj to Rowletts View, Biggleswade, SG18 0FD
Parish Name:Biggleswade
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Residential Development of 2 No. semi detached dwellings, 2 No. detached dwellings & associated garage blocks
Case Officer:Donna Lavender
Case Officer Tel:0300 300 5095
Case Officer Email:donna.lavender@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr R Beaty
11a Thorncote Green
Sandy
Beds
SG19 1PU
Press Date:04 / 11 / 2016
Site Notice Date:02 / 11 / 2016
NeighboursResponses Received: 1
and Representatives:In Favour: 0
Representation DetailsAgainst: 1
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:30/11/2016
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:07 / 12 / 2016
Date Decision Despatched:07 / 12 / 2016
Decision:Full Application - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the National Planning Policy Framework (NPPF) and the Core Strategy for North Central Bedfordshire.
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to. There is a duty to assess for Asbestos Containing Materials (ACM) during development and measures undertaken during removal and disposal should protect site workers and future users, while meeting the requirements of the HSE.The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to. The British Standard for Subsoil, BS 8601 Specification for subsoil and requirements for use, should also be adhered to. There is a duty to assess for Asbestos Containing Materials (ACM) during development and measures undertaken during removal and disposal should protect site workers and future users, while meeting the requirements of the HSE.
4 )The applicant is advised that under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of construction of the development hereby approved. The applicant is advised that Central Bedfordshire Council as highway authority will not consider the proposed on-site vehicular areas for adoption as highway maintainable at public expense.The applicant is advised that under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of construction of the development hereby approved. The applicant is advised that Central Bedfordshire Council as highway authority will not consider the proposed on-site vehicular areas for adoption as highway maintainable at public expense.
5 )No materials or vehicles associated with the development should be left on or near the public footpath which may cause a hazard or inconvenience to users. The applicant must ensure that there is no encroachment beyond the property's legal boundary onto the width of the public footpath. However if a footpath closure is needed this will require at least six weeks notice. Should scaffolding be required over the public footpath, the Council's Highway department would also require notice of this so that a scaffolding licence can be processed and granted.No materials or vehicles associated with the development should be left on or near the public footpath which may cause a hazard or inconvenience to users. The applicant must ensure that there is no encroachment beyond the property's legal boundary onto the width of the public footpath. However if a footpath closure is needed this will require at least six weeks notice. Should scaffolding be required over the public footpath, the Council's Highway department would also require notice of this so that a scaffolding licence can be processed and granted.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page