| Informative Notes: | | 1
)In accordance with Article 22 of the Town & Country Planning (General Development Procedure) Order 1995 (as Amended), the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan comprising of the Regional Spatial Strategy for the East of England (the East of England Plan and the Milton Keynes and South Midlands Sub-Regional Strategy), Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review and material considerations do not indicate otherwise. The policies which refer are as follows:
Regional Spatial Strategy
ENV7 - Quality in the Built Environment
Bedfordshire Structure Plan 2011
7 - Areas of Great Landscape Value
South Bedfordshire Local Plan Review
BE8 - Design Considerations
GB3 - Green Belt Villages
H12 - Infilling in Villages
T10 - Parking - New Development
NE3 - Control of Development in AGLVIn accordance with Article 22 of the Town & Country Planning (General Development Procedure) Order 1995 (as Amended), the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan comprising of the Regional Spatial Strategy for the East of England (the East of England Plan and the Milton Keynes and South Midlands Sub-Regional Strategy), Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review and material considerations do not indicate otherwise. The policies which refer are as follows:
Regional Spatial Strategy
ENV7 - Quality in the Built Environment
Bedfordshire Structure Plan 2011
7 - Areas of Great Landscape Value
South Bedfordshire Local Plan Review
BE8 - Design Considerations
GB3 - Green Belt Villages
H12 - Infilling in Villages
T10 - Parking - New Development
NE3 - Control of Development in AGLV |
| 2
)In accordance with Article 22 of the Town and Country Planning (General Development Procedure) Order 1995 (as Amended), the reason for any condition above relates to the Policies as referred to in the Regional Spatial Strategy (RSS), Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).In accordance with Article 22 of the Town and Country Planning (General Development Procedure) Order 1995 (as Amended), the reason for any condition above relates to the Policies as referred to in the Regional Spatial Strategy (RSS), Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR). |
| 3
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 4
)No works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to write to Central Bedfordshire Council's Customer Contact Centre, 6th Floor, Borough Hall, Bedford, MK42 9AP quoting the Planning Application number and supplying a copy of the Decision Notice and a copy of the approved plan. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.No works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to write to Central Bedfordshire Council's Customer Contact Centre, 6th Floor, Borough Hall, Bedford, MK42 9AP quoting the Planning Application number and supplying a copy of the Decision Notice and a copy of the approved plan. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration. |
| 5
)The requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Central Bedfordshire Highways, Streetworks Co-ordination Unit, Borough Hall, Bedford. MK42 9AP.The requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Central Bedfordshire Highways, Streetworks Co-ordination Unit, Borough Hall, Bedford. MK42 9AP. |
| 6
)The applicant is advised that photographs of the existing highway that is to be used for access and delivery of materials will be required by the Local Highway Authority. Any subsequent damage to the public highway resulting from the works as shown by the photographs, including damage caused by delivery vehicles to the works, will be made good to the satisfaction of the Local Highway Authority and at the expense of the applicant. Attention is drawn to Section 59 of the Highways Act 1980 in this respect.The applicant is advised that photographs of the existing highway that is to be used for access and delivery of materials will be required by the Local Highway Authority. Any subsequent damage to the public highway resulting from the works as shown by the photographs, including damage caused by delivery vehicles to the works, will be made good to the satisfaction of the Local Highway Authority and at the expense of the applicant. Attention is drawn to Section 59 of the Highways Act 1980 in this respect. |
| 7
)The closure of existing access shall include the reinstatement of the highway to include any footway, verge and kerbing in a manner to be agreed in writing with the Development Planning and Control Group, Central Bedfordshire Council, Borough Hall, Bedford, MK42 9AP. No work shall be carried out within the confines of the public highway without prior consent. The applicant will also be expected to bear all costs involved in closing the access.The closure of existing access shall include the reinstatement of the highway to include any footway, verge and kerbing in a manner to be agreed in writing with the Development Planning and Control Group, Central Bedfordshire Council, Borough Hall, Bedford, MK42 9AP. No work shall be carried out within the confines of the public highway without prior consent. The applicant will also be expected to bear all costs involved in closing the access. |
| 8
)The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to.
Applicants are reminded that, should groundwater or surface water courses be at risk of contamination during or after development, the Environment Agency at Brampton should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission.The British Standard for Topsoil, BS 3882:2007, specifies requirements for topsoils that are moved or traded and should be adhered to.
Applicants are reminded that, should groundwater or surface water courses be at risk of contamination during or after development, the Environment Agency at Brampton should be approached for approval of measures to protect water resources separately, unless an Agency condition already forms part of this permission. |
|
|---|