| Informative Notes: | | 1
)In accordance with Article 22 of the Town & Country Planning (General Development Procedure) Order 1995 (as Amended), the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan comprising of the Regional Spatial Strategy for the East of England (the East of England Plan and the Milton Keynes and South Midlands Sub-Regional Strategy), Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review and material considerations do not indicate otherwise. The policies which refer are as follows:
Regional Spatial Strategy
East of England Plan (May 2008)
ENV7 (Quality of the Built Environment)
South Bedfordshire Local Plan Review
BE8 (Design Considerations)
H8 (Extensions to Dwellings)
T10 (Parking)In accordance with Article 22 of the Town & Country Planning (General Development Procedure) Order 1995 (as Amended), the Council hereby certify that the proposal as hereby approved conforms with the relevant policies of the Development Plan comprising of the Regional Spatial Strategy for the East of England (the East of England Plan and the Milton Keynes and South Midlands Sub-Regional Strategy), Bedfordshire Structure Plan 2011 and the South Bedfordshire Local Plan Review and material considerations do not indicate otherwise. The policies which refer are as follows:
Regional Spatial Strategy
East of England Plan (May 2008)
ENV7 (Quality of the Built Environment)
South Bedfordshire Local Plan Review
BE8 (Design Considerations)
H8 (Extensions to Dwellings)
T10 (Parking) |
| 2
)In accordance with Article 22 of the Town and Country Planning (General Development Procedure) Order 1995 (as Amended), the reason for any condition above relates to the Policies as referred to in the Regional Spatial Strategy (RSS), Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR).In accordance with Article 22 of the Town and Country Planning (General Development Procedure) Order 1995 (as Amended), the reason for any condition above relates to the Policies as referred to in the Regional Spatial Strategy (RSS), Bedfordshire Structure Plan 2011 (BSP) and the South Bedfordshire Local Plan Review (SBLPR). |
| 3
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 4
)No new area of hardstanding (or the repair of existing hardstanding), greater than 5 square metres, shall be constructed without the benefit of planning permission unless the materials used are porous or provision is made for any run-off to drain to a permeable or porous area elsewhere within the cartilage of the dwelling. Further advice and guidance about the permeable surfacing of front gardens has been produced jointly by the Environment Agency and the Department for Communities and Local Government and can be found online at: www.communities.gov.uk/publications/planningandbuilding/pavingfrontgardensNo new area of hardstanding (or the repair of existing hardstanding), greater than 5 square metres, shall be constructed without the benefit of planning permission unless the materials used are porous or provision is made for any run-off to drain to a permeable or porous area elsewhere within the cartilage of the dwelling. Further advice and guidance about the permeable surfacing of front gardens has been produced jointly by the Environment Agency and the Department for Communities and Local Government and can be found online at: www.communities.gov.uk/publications/planningandbuilding/pavingfrontgardens |
| 5
)If during any site investigation, excavation, engineering or construction works, evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified, shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use. Further information can be obtained from Danielle Newnham, Public Protection, Tel: 0300 300 5068.If during any site investigation, excavation, engineering or construction works, evidence of land contamination is identified, the applicant shall notify the Local Planning Authority without delay. Any land contamination identified, shall be remediated to the satisfaction of the Local Planning Authority to ensure that the site is made suitable for its end use. Further information can be obtained from Danielle Newnham, Public Protection, Tel: 0300 300 5068. |
|
|---|