1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/17/00444/VOC

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Variation of Condition
Date Received:31 / 01 / 2017
Registration (Validation) Date:02 / 02 / 2017
Consultation Start Date:02 / 02 / 2017
Earliest Decision Date (Consultation Period Expires):10 / 03 / 2017
Target Date for Decision:30 / 03 / 2017
Location:Studham Nursery, Clements End Road, Studham, Dunstable, LU6 2NG
Parish Name:Studham
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Not available
Description:Variation of condition 2 to planning permission CB/16/04242/FULL - To Increase ridge heights of plots 2 and 3 by 500mm
Case Officer:Nicola Golder
Case Officer Tel:0300 300 4112
Case Officer Email:nicola.golder@centralbedfordshire.gov.uk
Status:Decided
Agent:Mr A Morrow
Kingsbrook House
7 Kingsway
Bedford
MK42 9BA
Press Date:No date
Site Notice Date:No date
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:29/03/2017
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:10 / 04 / 2017
Date Decision Despatched:10 / 04 / 2017
Decision:Variation of Condition - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).
2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
3 )The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration (SuDS). The Environment Agency consider any infiltration (SuDS) greater than 2.0 m below ground level to be a deep system and would generally not be acceptable. All infiltration SuDS require a minimum of 1.2 m clearance between the base of infiltration SuDS and peak seasonal groundwater levels. All need to meet the criteria in our Groundwater Protection: Principles and Practice (GP3) position statements G1 to G13 which can be found here: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/297347/LIT_7660_9a3742.pdf. In addition, they must not be constructed in ground affected by contamination.The water environment is potentially vulnerable and there is an increased potential for pollution from inappropriately located and/or designed infiltration (SuDS). The Environment Agency consider any infiltration (SuDS) greater than 2.0 m below ground level to be a deep system and would generally not be acceptable. All infiltration SuDS require a minimum of 1.2 m clearance between the base of infiltration SuDS and peak seasonal groundwater levels. All need to meet the criteria in our Groundwater Protection: Principles and Practice (GP3) position statements G1 to G13 which can be found here: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/297347/LIT_7660_9a3742.pdf. In addition, they must not be constructed in ground affected by contamination.
4 )The developer should address risks to controlled waters from contamination at the site, following the requirements of the National Planning Policy Framework and the Environment Agency Guiding Principles for Land Contamination, which can be found here: https://www.gov.uk/government/publications/managing-and-reducing-land-contaminationThe developer should address risks to controlled waters from contamination at the site, following the requirements of the National Planning Policy Framework and the Environment Agency Guiding Principles for Land Contamination, which can be found here: https://www.gov.uk/government/publications/managing-and-reducing-land-contamination
5 )Fire Hydrant Advice On a residential site one hydrant is required at least every 180 metres with no property further than 90 metres from the nearest hydrant. The minimum flow should be as described in the National Guidance Document published by UK Water and the Local Government Association. The relevant section is copied below from Appendix 5:- 'Housing developments with units of detached or semi-detached houses of not more than two floors, should have a water supply capable of delivering a minimum of eight litres per second through any single hydrant. Multi-occupied housing developments with units of more than two floors, should have a water supply capable of delivering a minimum of 20 to 35 litres per second through any single hydrant on the development." Although this will be dealt with at Building Regulations Consultation stage, the developer's attention is drawn to the requirements of 'Approved Document B (Fire Safety) Volume 2 Buildings other than Dwelling Houses B5 Access and Facilities for the Fire Service' to ensure compliance is met. In addition to the formal guidance or requirements, I would add that where possible, consideration is given to access for the hydrants, so they are positioned on pathways/pedestrian areas, close to but not within vehicle standing areas where they are likely to be obstructed by parked cars/lorries (e.g. in an area designated for parking or loading as part of the development).Fire Hydrant Advice On a residential site one hydrant is required at least every 180 metres with no property further than 90 metres from the nearest hydrant. The minimum flow should be as described in the National Guidance Document published by UK Water and the Local Government Association. The relevant section is copied below from Appendix 5:- 'Housing developments with units of detached or semi-detached houses of not more than two floors, should have a water supply capable of delivering a minimum of eight litres per second through any single hydrant. Multi-occupied housing developments with units of more than two floors, should have a water supply capable of delivering a minimum of 20 to 35 litres per second through any single hydrant on the development." Although this will be dealt with at Building Regulations Consultation stage, the developer's attention is drawn to the requirements of 'Approved Document B (Fire Safety) Volume 2 Buildings other than Dwelling Houses B5 Access and Facilities for the Fire Service' to ensure compliance is met. In addition to the formal guidance or requirements, I would add that where possible, consideration is given to access for the hydrants, so they are positioned on pathways/pedestrian areas, close to but not within vehicle standing areas where they are likely to be obstructed by parked cars/lorries (e.g. in an area designated for parking or loading as part of the development).
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page