1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/17/04518/MWR3

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Minerals & Waste Regulation 3
Date Received:21 / 09 / 2017
Registration (Validation) Date:21 / 09 / 2017
Consultation Start Date:21 / 09 / 2017
Earliest Decision Date (Consultation Period Expires):25 / 10 / 2017
Target Date for Decision:21 / 12 / 2017
Location:Thorn Turn WP, Thorn Road, Houghton Regis, Dunstable, LU6 1RT
Parish Name:Houghton Regis
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Officer Delegated
Description:Regulation 3: Variation of conditions 1 and 30 of permission ref. CB/15/01626/REG3 to allow changes to the waste park development (part retrospective).
Case Officer:David Peachey
Case Officer Tel:0300 300 6211
Case Officer Email:MWApplications@centralbedfordshire.gov.uk
Status:Decided
Agent:Miss P Butler
Chadwick House
Birchwood Park
Warrington
WA3 6AE
Press Date:04 / 10 / 2017
Site Notice Date:No date
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:02/11/2017
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:22 / 12 / 2017
Date Decision Despatched:22 / 12 / 2017
Decision:Regulation 3 - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )1 With reference to Conditions 20, 21 and 34, Heavy Goods Vehicle (HGV) means a vehicle above a gross weight of 7.5 tonnes.1 With reference to Conditions 20, 21 and 34, Heavy Goods Vehicle (HGV) means a vehicle above a gross weight of 7.5 tonnes.
2 )2 For the purposes of Condition 20, a single Heavy Goods Vehicle (HGV) entering and leaving the site, whether loaded or empty, shall count as 2 movements.2 For the purposes of Condition 20, a single Heavy Goods Vehicle (HGV) entering and leaving the site, whether loaded or empty, shall count as 2 movements.
3 )With reference to Condition 26, the lighting scheme shall be designed to comply with the Institute of Lighting Engineers' Guidance Notes for the reduction of Obtrusive Light.With reference to Condition 26, the lighting scheme shall be designed to comply with the Institute of Lighting Engineers' Guidance Notes for the reduction of Obtrusive Light.
4 )The applicant is advised to ensure that the public bridleway remains available at all times during construction and safe for the public to continue to use with appropriate signage. Should it become apparent that the public bridleway needs to be temporarily closed or diverted on public safety grounds, the Rights of Way Team will need to be contacted so that a temporary closure order can be processed. The lead in time for a temporary closure is a minimum of 6 weeks i.e. 6 weeks notice before the proposed closure date is required for the team to process and advertise the closure.The applicant is advised to ensure that the public bridleway remains available at all times during construction and safe for the public to continue to use with appropriate signage. Should it become apparent that the public bridleway needs to be temporarily closed or diverted on public safety grounds, the Rights of Way Team will need to be contacted so that a temporary closure order can be processed. The lead in time for a temporary closure is a minimum of 6 weeks i.e. 6 weeks notice before the proposed closure date is required for the team to process and advertise the closure.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page