1. Return to Search Page >>2. Search Results >>3. Planning Application Detail
Details of Planning Application - CB/17/04531/REG3

Click on the Consultation link below for neighbour and statutory consultee information and to comment on this application. Ensure your opinions are received before the consultation closing date.


Application Details View Documents (opens in new window) Consultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Regulation 3
Date Received:22 / 09 / 2017
Registration (Validation) Date:22 / 09 / 2017
Consultation Start Date:22 / 09 / 2017
Earliest Decision Date (Consultation Period Expires):25 / 10 / 2017
Target Date for Decision:22 / 12 / 2017
Location:Thorn Turn HD, Thorn Road, Houghton Regis, Dunstable, LU6 1RT
Parish Name:Houghton Regis
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not available
Expected Decision Level:Officer Delegated
Description:Regulation 3: Variation of conditions 1 and 28 of permission ref. CB/15/01627/REG3 for part retrospective permission to regularise changes to the design and sizes of the Salt Barn, Vehicle Stores / Maintenance building & Highways Office; new footway to access road; additional sub-station; amendments to ancillary development, parking provision & surfacing; increase in height of security fencing & additional fencing; and revised landscaping.
Case Officer:Jerry Smith
Case Officer Tel:0300 300 5881
Case Officer Email:jerry.smith@centralbedfordshire.gov.uk
Status:Decided
Agent:Miss P Butler
Chadwick House
Birchwood Park
Warrington
WA3 6AE
Press Date:04 / 10 / 2017
Site Notice Date:No date
NeighboursResponses Received: 0
and Representatives:In Favour: 0
Representation DetailsAgainst: 0
Comments: 0
Petitions Against: 0
Petitions For: 0
Officer Site Visit Date:02/11/2017
Committee Site Visit Date:No date
Committee Meeting Date:No date
Decision Level:Officer Delegated
Date Decision Made:22 / 03 / 2018
Date Decision Despatched:22 / 03 / 2018
Decision:Regulation 3 - Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1 )With reference to Condition 10 the applicant is advised that closure of any bedger sett requires an application for a licence to be granted by Natural England. Closure of any sett needs to be undertaken in full accordance with the terms and conditions of any such licence which may be issued.With reference to Condition 10 the applicant is advised that closure of any bedger sett requires an application for a licence to be granted by Natural England. Closure of any sett needs to be undertaken in full accordance with the terms and conditions of any such licence which may be issued.
2 )With reference to Conditions 19 and 20, Heavy Goods Vehicle (HGV) means a vehicle above a gross weight of 7.5 tonnes.With reference to Conditions 19 and 20, Heavy Goods Vehicle (HGV) means a vehicle above a gross weight of 7.5 tonnes.
3 )With reference to Condition 19, for the purposes of this condition, a single Heavy Goods Vehicle entering and leaving the site, whether loaded or empty, shall count as 2 movements.With reference to Condition 19, for the purposes of this condition, a single Heavy Goods Vehicle entering and leaving the site, whether loaded or empty, shall count as 2 movements.
4 )With reference to Condition 25, the lighting scheme shall be designed to comply with the Institute of Lighting Engineers Guidance Notes for the reduction of Obtrusive Light.With reference to Condition 25, the lighting scheme shall be designed to comply with the Institute of Lighting Engineers Guidance Notes for the reduction of Obtrusive Light.
5 )The applicant is advised to ensure that Bridleway No. 49 remains available at all times during construction and safe for the public to continue to use with appropriate signage. Should it become apparent that the public bridleway needs to be temporarily closed or diverted on public safety grounds, the Rights of Way Team will need to be contacted so that a temporary closure order can be processed. The lead-in time for a temporary closure is a minimum of 6 weeks - i.e. 6 weeks notice before the proposed clsoure date is required for the team to process and advertise the order.The applicant is advised to ensure that Bridleway No. 49 remains available at all times during construction and safe for the public to continue to use with appropriate signage. Should it become apparent that the public bridleway needs to be temporarily closed or diverted on public safety grounds, the Rights of Way Team will need to be contacted so that a temporary closure order can be processed. The lead-in time for a temporary closure is a minimum of 6 weeks - i.e. 6 weeks notice before the proposed clsoure date is required for the team to process and advertise the order.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available

Return to Search PageTop of Page