)In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF).In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the South Bedfordshire Local Plan Review (SBLPR) and the National Planning Policy Framework (NPPF). |
| 2
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. |
| 3
)The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from The Street Works Co-ordinator, Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8049.The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from The Street Works Co-ordinator, Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8049. |
| 4
)The applicant is advised that the storage of materials associated with this development should take place within the site and not extend into the public highway without authorisation from the highway authority. If necessary further details can be obtained from The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8049.The applicant is advised that the storage of materials associated with this development should take place within the site and not extend into the public highway without authorisation from the highway authority. If necessary further details can be obtained from The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8049. |
| 5
)The applicant is advised that, under the provisions of the Highways Act 1980, no part of the structure, including cellars, foundations and surface water hardware shall be erected or installed in, under or overhanging the public highway and no window, door or gate shall be fixed so as to open outwards into the highway. The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway.The applicant is advised that, under the provisions of the Highways Act 1980, no part of the structure, including cellars, foundations and surface water hardware shall be erected or installed in, under or overhanging the public highway and no window, door or gate shall be fixed so as to open outwards into the highway. The Highway Authority has the power under Section 143 of the Highways Act 1980, to remove any structure erected on a highway. |
| 6
)The applicant is advised that best practical means should be taken at all times to ensure that all vehicles leaving the development site during demolition/construction of the development are in a condition such as to not emit dust or deposit mud, slurry or other debris on the highway, in particular efficient means should be installed prior to commencement of the development and thereafter maintained and employed at all times during construction of the development of cleaning the wheels of all construction vehicles leaving the site.The applicant is advised that best practical means should be taken at all times to ensure that all vehicles leaving the development site during demolition/construction of the development are in a condition such as to not emit dust or deposit mud, slurry or other debris on the highway, in particular efficient means should be installed prior to commencement of the development and thereafter maintained and employed at all times during construction of the development of cleaning the wheels of all construction vehicles leaving the site. |
|
|---|