| Details of Planning Application -
CB/17/04939/VOC |
| Application registered | Consultation period | Awaiting decision | Decided | Appeal | Appeal decided |
|
|---|
| Application Type: | Variation of Condition |
|---|
| Date Received: | 12
/
10
/
2017 |
|---|
| Registration (Validation) Date: | 16
/
10
/
2017 |
|---|
| Consultation Start Date: | 16
/
10
/
2017 |
|---|
| Earliest Decision Date (Consultation Period Expires): | 28
/
11
/
2017 |
|---|
| Target Date for Decision: | 11
/
12
/
2017 |
|---|
| Location: | 9 Silsoe Road, Maulden, Bedford, MK45 2AX |
|---|
| Parish Name: | Maulden |
|---|
| Conservation Area: | Not available |
|---|
| Listed Building Grade: | Not available |
|---|
| Environmental Assessment: | Not available |
|---|
| Expected Decision Level: | Not available |
|---|
| Description: | Variation or removal of condition 6 of planning permission CB/16/05823/OUT. The condition is requested to be removed or restricted to 1.5 storeys with rooms in the roof with and agreed maximum ridge height. |
|---|
| Case Officer: | Matthew Heron |
|---|
| Case Officer Tel: | 0300 300 4275 |
|---|
| Case Officer Email: | matthew.heron@centralbedfordshire.gov.uk |
|---|
| Status: | Decided |
|---|
| Agent: | Mr Andrade |
|---|
| 17 Harold Street |
|---|
| Hereford |
|---|
| Hereford |
|---|
| HR1 2QU |
|---|
| Press Date: | No date |
|---|
| Site Notice Date: | No date |
|---|
| Neighbours | Responses Received:
1 |
|---|
| and Representatives: | In Favour:
0 |
|---|
| Representation Details | Against:
1 |
|---|
| Comments:
0 |
|---|
| Petitions Against:
0 |
|---|
| Petitions For:
0 |
|---|
| Officer Site Visit Date: | 16/11/2017 |
|---|
| Committee Site Visit Date: | 02/01/2018 |
|---|
| Committee Meeting Date: | 03
/
01
/
2018 |
|---|
| Decision Level: | Development Management Committee |
|---|
| Date Decision Made: | 03
/
01
/
2018 |
|---|
| Date Decision Despatched: | 05
/
01
/
2018 |
|---|
| Decision: | Variation of Condition - Granted |
|---|
| Conditions or Reasons: | View Conditions or Reasons |
|---|
| Informative Notes: | | 1
)This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
The applicant is advised to liaise with the Council's Building Control Team and the Fire Service to discuss measures to minimise the risk of fire in the event that fire vehicles are not able to access the site.
The applicant is advised that no works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk, Tel: 0300 300 8049 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Highways Help Desk tel: 0300 300 8049.
The applicant is advised that photographs of the existing highway that is to be used for access and delivery of materials will be required by the Local Highway Authority. Any subsequent damage to the public highway resulting from the works as shown by the photographs, including damage caused by delivery vehicles to the works, will be made good to the satisfaction of the Local Highway Authority and at the expense of the applicant. Attention is drawn to Section 59 of the Highways Act 1980 in this respect.
The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'.
The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
The applicant is advised to liaise with the Council's Building Control Team and the Fire Service to discuss measures to minimise the risk of fire in the event that fire vehicles are not able to access the site.
The applicant is advised that no works associated with the construction of the vehicular access should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to contact Central Bedfordshire Council's Highway Help Desk, Tel: 0300 300 8049 quoting the Planning Application number. This will enable the necessary consent and procedures under Section 184 of the Highways Act to be implemented. The applicant is also advised that if any of the works associated with the construction of the vehicular access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) then the applicant will be required to bear the cost of such removal or alteration.
The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained from the Highways Help Desk tel: 0300 300 8049.
The applicant is advised that photographs of the existing highway that is to be used for access and delivery of materials will be required by the Local Highway Authority. Any subsequent damage to the public highway resulting from the works as shown by the photographs, including damage caused by delivery vehicles to the works, will be made good to the satisfaction of the Local Highway Authority and at the expense of the applicant. Attention is drawn to Section 59 of the Highways Act 1980 in this respect.
The applicant is advised that all cycle parking to be provided within the site shall be designed in accordance with the Central Bedfordshire Council's 'Cycle Parking Annexes July 2010'.
The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. |
|
|---|
| Appeal Received Date: | This case has no appeals against it |
|---|
| Planning Obligation Status: | Not available |
|---|